E.T.Brown
Golder Associates Pty Ltd.,PO Box 1734,Milton,Queensland 4064,Australia
Ground or rock anchors (sometimes referred to as anchorages)of a number of types have long been used for a range of purposes in rock engineering and in geotechnical engineering more generally(Hobst and Zajíc,1977;Hanna,1982;Habib,1989;Xanthakos,1991;Littlejohn,1993,1997).Rock anchors are capable of transmitting an applied tensile load to the rock mass and may be used,for example,to reinforce rock slopes and underground excavations;stabilise sheet pile,diaphragm and retaining walls;anchor building,bridge,power transmission line and other tower or mast structure foundations;anchor marine structures;stabilise large excavations such as dry or graving docks potentially subject to uplift;and for a number of purposes in dam engineering to be discussed in Section 2.
Depending on their purpose,rock anchors may be temporary or permanent,and may be passive or post-tensioned(sometimes referred to as pre-stressed).They may also vary greatly in orientation with respect tovertical,in size(including in both length and diameter),in the nature and size of the tendon(bar,wire or strand,either singly or in groups)providing the essential tensile capacity,and in the ultimate load-carrying capacity of the anchor.In this paper,emphasis will be placed on large-scale,high-capacity,permanent rock anchors of the type illustrated schematically in Fig.1.Features of this class of rock anchor include the provision of a fixed anchor or tendon bond length,a free tendon length,a stressable(and preferably re-stressable)anchor head,and double corrosion protection.Obviously,in terms of their scale,purposes,rock engineering design and detailed design and installation,these large rock anchors can differ significantly from the rock bolts,cable bolts and rock socketed piles used widely in surface and underground construction and mining.However,these elements all have some features in common that allow data,understandings and elements of design approaches to be transferred from one application to another.
The purpose of this paper is to review international practice in the rock mechanics and rock engineering design of rock anchors which,as will be shown,has remained largely unchanged since the 1970s.The paper will deal mainly,but not exclusively,with the design of large anchors of the type shown in Fig.1 and with their application in dam engineering,particularly for concrete gravity,buttress and arch dams.Some emphasis will be placed on Australian practice which is the source of the author’s practical experience in this area.It is recognised that some of the terminology used may differ from country to country.
Fig.1.Components of a typical large,permanent,post-tensioned dam rock anchor(Cavill,1997).
Post-tensioned,and in some cases,passive(Hobst and Zajíc,1977;Bretas et al.,2010)rock anchors have been used for a range of applications in dam engineering over the last 80 years(Bruce,1988).These applications include providing:
·resistance to overturning(Banks,1957;Khaoua et al.,1969);
·restraint against downstream sliding(Maddox et al.,1967;Gosschalk and Taylor,1970);
·reinforcement of excavated abutment and other slopes(Liang,1995;She,2004);
·stabilisation of thrust blocks(Dickson and Loar,2011);
·additional seismic resistance(Singhal and Nuss,1991;Bianchi and Bruce,1993;Lawrence and Martin,2007);
·tying down of spillway,training wall and stilling basin structures(Hobst and Zajíc,1977;Cavill,1997;Topham et al.,2013);
·stabilisation of plunge pools and other erosion features(Lowe et al.,1979;La Villa and Golser,1982);and
·raising and/or strengthening older dams that no longer meet safety or capacity requirements(ANCOLD,1992;Xu and Benmokrane,1996;Cavill,1997;Snape,2002).
The first recognised use of post-tensioned anchors in dam engineering was for the raising and strengthening of the 30 m high Cherfas gravity dam in Algeria in 1936(Hobst and Zajíc,1977;Khaoua et al.,1969).For some time following their introduction into dam engineering,post-tensioned anchors were used in the initial design and construction of concrete dams and their appurtenant structures(e.g.Banks,1957;Wilkins and Fidler,1959;Maddox et al.,1967;Gosschalk and Taylor,1970;Hobst and Zajíc,1977).More recently,the major use of post-tensioned anchors in dam engineering has been for the raising or strengthening of existing dams.
Xu and Benmokrane(1996)carried out a major review of the then state-of-the-art of the strengthening of existing concrete dams using post-tensioned anchors.They listed the main reasons for strengthening existing dams as being to:
·meet changes in safety standards;
·overcome deficiencies in design and construction;·recover loss of strength due to deterioration;and·raise the heights of dams.
In many countries,the former dam safety standards and design criteria based on historical flood levels have been replaced by criteria based on probable maximum flood(PMF)or probable maximum precipitation design flood(PMP DF)water flows and levels.The predicted design flood levels based on annual exceedance probabilities(AEPs)can be higher than the historical levels used in the original designs,so that the design spillway capacities of many existing dams are inadequate to pass the new design floods safely.Furthermore,the dams may potentially fail by overturning and/or sliding.This is particularly the case for dams designed before about 1946(in Australia,and at other times elsewhere)when uplift forces acting on the base of the dam were not allowed for adequately in design calculations(ANCOLD,1992;Cavill,1997;Kline et al.,2007;Duffaut,2013).As a result,many existing dams have been in need of upgrading,including raising,to meet the new design flood and related stability criteria.Another change in safety standards has been the application of maximum credible or design earthquake(MCE or MDE)criteria(Xu and Benmokrane,1996;Bruce,1997).Detailed discussion of these issues is beyond the scope of this paper.However,it is important to note that safety standards and terminologies may differ between countries and jurisdictions.For example,in the author’s home State of Queensland,Australia,the acceptable flood capacity(AFC)for a High A Hazard Category dam is the PMP DF(DEWS,2013).
Xu and Benmokrane(1996)collected and analysed data on 60 concrete dams that had been strengthened using post-tensioned anchors,mainly in the USA,Canada,Australia and Europe.They found that most dams had been strengthened for one or more of the following purposes:
·increasing spillway capacity and stability relating to the PMF;·upgrading to the MCE;
·upgrading dam stability relating to other conditions such asageing and deterioration;·raising dam height related to the PMF;
·raising dam height for greater storage;
·remedying deficiencies in design(e.g.not allowing adequately for uplift);
·stabilising concrete cracks;
·strengthening dam abutments;
·stabilising dam foundations;and
·reinforcing lock walls or building locks into cofferdams.
Fig.2 illustrates schematically the classical uses of posttensioned rock anchors in stabilising concrete gravity dams against(a)overturning,and(b)downstream sliding.Fig.2a shows the main forces used in calculating the anchor tension,T,required to maintain moment equilibrium about the downstream toe of the dam.Fig.2b shows the forces involved in a limiting equilibrium analysis of one of the several possible forms of downstream sliding(USACE,1995;Fell et al.,2005).It must be recognised that,in practice,concrete dams located in valleys with sloped rock foundation abutments will behave as three-dimensional(3D)structures and so will require 3D stability analyses(Lombardi,2007;Bretas et al.,2012).Clearly,different analytical models from those shown in Fig.2 would have to be used for the design of posttensioned anchors for stabilising other components of the overall dam structure such as thrust blocks for arch dams,and spillway,training wall and stilling basin structures.
民国时期开始对清末的新式学堂进行改造,自此开始有了小学义务教育,并逐步发展形成一定的规模。这部分中小学校园建立之初时,用地还不十分紧张,且受传统建筑形式的影响,校园各功能多分为独立地块,以教学楼环绕操场的形式进行布局。如果遇到入学人数增加及校园空间不够用的情况下,大多数校园会选择就近向外扩展,加盖一些建筑或缩减校园公共用地去做权益之计。总之传统的校园对于学生来说,除了教学内部的公共交通,基本活动都属于地面的。我们用x、y、z三维空间来看,即活动范围属于x、y轴的平面空间,而z轴方向的空间活动难以形成联系。
Since the time of the review by Xu and Benmokrane(1996),the numbers of concrete dams being strengthened or raised around the world have increased significantly,although the main reasons for doing so have remained essentially the same.In a 2007 review of rock anchoring of North American dams over the previous 40 years,Bruce and Wolfhope(2007,2008)identified 400 relevant cases and accessed 230 technical publications dealing with more than 200 dams.By this time,the sizes of the high-capacity anchors being used in dam engineering had increased considerably with tendons being made up of several tens of 15.2 mm diameter strands,each of which generally consists of seven twisted,low relaxation,high tensilesteel wires.A frequently used high-capacity tendon configuration consists of 91(or 92)15.2 mm diameter strands providing an ultimate axial tensile force capacity of 24 MN(Aschenbroich,2007;Cavill,2000;Harman et al.,2010).Even larger anchors than this have been used in some cases.
Fig.2.Schematic illustration of the use of post-tensioned anchors to resist(a)overturning,and(b)downstream sliding(after ANCOLD(1992)and USACE(1995)).
This sub-section will discuss the basic mechanics and general principles on which post-tensioned rock anchor design is based.The rock mechanics and rock engineering aspects of anchor design will be considered in more detail in Sections 4 and 5.Although strictly they lie somewhat outside the rock mechanics and rock engineering emphasis of this paper,for completeness and because they impact on the effectiveness of the rock engineering design,a number of important investigation,design and construction issues,including anchor stressing and testing,will be referred to brie fly in Section 6.
Traditionally,the dimensioning of rock anchor systems for dams has been based on two-dimensional(2D)static limiting equilibrium analyses of problem configurations such as those illustrated schematically in Fig.2.From these analyses,the anchor forces required to maintain stability per metre run,or at a particular location,can be established for particular load cases(often called normal or usual,unusual and extreme)and the associated factors of safety required by the Standards,Codes of Practice or Guidelines under which the design is being carried out(ANCOLD,1991,1992,2013;BC Hydro,1995;USACE,1995,2005;CDSA,1999).It is important to note that different load factors or factors of safety may be required by different authorities for similar load cases.Informative comparisons between a number of these approaches are given by Ebeling et al.(2000)and Fell et al.(2005).
More recently,linear and nonlinear numerical stress analysis approaches have been used to calculate forces,stresses and displacements in the concrete of the dam,the foundation and abutment rock,and at interfaces,and when assessing the dynamic stability of dams under earthquake loading(Alonso et al.,1996;Yu et al.,2005;Bureau et al.,2007;Scott and Mills-Bria,2008;Lemos,2011,2014;Chopra,2012).Some Standards,Codes of Practice and Guidelines now require the use of limit state approaches or of partial,rather than overall,factors of safety(Merrifield et al.,1997;Herweynen,1998;ANCOLD,2013;Farrell,2013).However,it has been recognised recently that the partial factor,limit state design approach used in Eurocode 7(CEN,2004),for example,may not be applicable to a range of rock engineering problems in which some of the uncertainty inparameter values is epistemic rather than fully aleatory as is assumed in the Eurocode approach(Bedi and Orr,2014;Harrison,2014;Lamas et al.,2014).Increasingly,reliability,risk-based,probabilistic and fragility methods of dam analysis and assessment are being used in rock anchor design for dams and other applications(Ellingwood and Tekie,2001;Phoon et al.,2003;Barker,2011;Westberg Wilde and Johansson,2013).Further discussion of these approaches is outside the purpose andscope of this paper.
As well as providing the resistance or stabilising forces required for the purposes referred to at the beginning of Section 2,grouted post-tensioned anchors themselves must be able to resist the four principal modes of applied tension-induced failure illustrated in Fig.3:
·Mode A-steel tendon tensile failure.
·Mode B-grout-tendon bond or interface failure.
·Mode C-rock-grout bond or interface failure.
Fig.3.Principal modes of failure of grouted rock anchors under applied axial tension.(a)Mode A-steel tendon tensile failure;(b)Mode B-grout-tendon bond or interface failure;(c)Mode C-rock-grout bond or interface failure;and(d)Mode D-rock mass uplift failure(Pease and Kulhawy,1984).
Following Kim and Cho(2012),if the ultimate tensile load capacities of an anchor for failure Modes A,B,C and D areandQru,respectively,then the ultimate tensile capacity of the anchor,Qu,will be the minimum of these four values,i.e.
In addition to these four major modes of failure under applied tension,for large-scale post-tensioned rock anchors of the type illustrated in Fig.1,it is necessary to consider the possibilityof shear failure at the internal and external interfaces between the grout and the corrugated sheathing providing a layer of corrosion protection.In the usual case,the depth of the corrugations in the sheathing provides an adequate degree of interlock.
In design practice,it is a common procedure to carry out design calculations to select the length of anchor embedment required to produce pre-determined factors of safety against failure Modes B,C and D.The design length of embedment is then selected as the largest of these values(USACE,2005).In most practical cases it is found that Mode C is more critical than Mode B.
The essential purpose of the remainder of this paper will be to review the rock mechanics and rock engineering aspects of design against failure Modes C and D.However,for completeness,summary discussions of design against failure Modes A and B will be given.In the discussions of failure Modes A,B,C and D to follow,a single post-tensioned anchor will be generally considered.It must be recognised,however,that in dam engineering practice,anchors are usually used in relativelyclosely-spaced rows and sometimes in multiple rows.The interactions between adjacent anchors,particularly in the Mode D case,must be taken into account in design calculations.
In Mode A failure,the applied axial tensile stress exceeds the yield and,ultimately,the ultimate tensile strengthof the steel in the tendon.IfAtis the cross-sectional area of steel in the tendon andσtuis the ultimate tensile strength of the steel,then the ultimate tensile capacity is given by
This value is sometimes referred to as the minimum breaking load(MBL)(ANCOLD,1992).In practice,it is usual to de fine the designworking load(WL)as a proportion of the MBL,oftentaken as 60%-65%in Australia.During installation of the anchor,it is commonpractice totest load the anchor and fittings beyond the normal WL(for example,up to 78%-80%MBL)and to “lock-off”the load with suf ficient allowance above the WL(for example,to 68%-72%MBL)to allow for subsequent load losses caused by creep,relaxation and draw-in(ANCOLD,1992).This is one of the areas in which different terminologies may be used in different countries and by different authorities.
For the large,high-capacity,post-tensioned anchors now being used for concrete dams,it is unusual for Mode A failure to be a controlling feature of the design.However,as will be discussed brie fl y in Section 6,several other factors which are beyond the scope of this paper have to be taken into account in the detailed design,fabrication,installation,stressing and monitoring of the anchors.
The shear resistance developed at the grout-tendon interface arises from adhesion,friction and mechanical interlock between the grout and the tendon.On the initial application of the axial tensile load to the anchor,shear failure at the grout-tendon interface is resisted by adhesion and interlocking.Then as displacement increases,these components of shear resistance may be overcome at points along the bond length and friction then makes the major contribution to shear resistance(Kim and Cho,2012).Because of the dif ficulty of distinguishing between and evaluating these components of shear resistance,it is common practice to calculate the grout-tendon shear resistance as
wherertis the radius of the steel tendon,is the length of the grout-tendon bond,and(z)is the shear resistance generated at distancezalong the grout-tendon interface where
It is often assumed that the mobilised shear resistance,τtgu,is constant over the grout-tendon interface length,lbtg,greatly simplifying the calculation of.It is often further assumed that the constant value ofτtgudepends on the composition and surface properties of the tendon and the compressive or shear strength of the grout.Littlejohn and Bruce(1977)and Littlejohn(1993),among others,provided presumptive values offor a range of conditions.Most Codes of Practice or Standards stipulate maximum allowable values of bond stress for different types of tendon and grout,generally in the range 1.0-3.0 MPa.In practice,if the tendon WL is pre-determined,the grout-tendon bond length required to generate a particular factor of safety for a given bond strength can be calculated readily from a simplified version of Eq.(3).It is sometimes assumed that consideration of grout-tendon bond failure is not necessary because consideration of the rock-grout bond failure(Mode C)alone will produce a more than adequate tendon embedment length(Littlejohn and Bruce,1977).
A number of detailed investigations have demonstrated that the simplifying assumptions made using the approach outlined in the preceding paragraphs are rarely justified.For example,several authors have shown that the grout-tendon interface shear strength depends on the normal confining pressure and stiffness,the roughness of the tendon,whether or not the cement in the grout is expansive,and the grouted bond length(Benmokrane et al.,1995;Barley,1997;Jarred and Haber field,1997).
The recorded influence of the grouted bond length probably reflects the now widely accepted finding that the distribution of shear stressalong the grouted length is far fromuniform,tending to decay exponentially from the free-length value at the end of the grouted length or proximal end,towards zero at the bottom of the grouted length or distal end(see Fig.4),depending on the assumptions made in the analysis(Coates and Yu,1970;Farmer,1975;Benmokrane et al.,1995;Ivanovi′c and Neilson,2009;Liu et al.,2013).The ratio of the elastic modulus of the steel tendon,Ea,to that of the grout,Eg(if there is a thick annulus of grout),or alternatively of the rock,has been found to have a particularly important influence on the distribution of elastic shear stress along the embedment length.As shown in Fig.4 for the case of a fully embedded,shallow anchor,for low modulus ratios of between 0.1 and 1.0 for stiffer grouts and rocks,the stress distribution is markedly non-uniform,but as this ratio increases in softer grouts and rocks,the stress distribution becomes more closely uniform(Coates and Yu,1970;Liu et al.,2013).
In practice,the possibility must be considered that de-bonding will occur at the more highly stressed proximal end of the bonded length(the top in Fig.3b),most probably during prestressing(Benmokrane et al.,1995),resulting in a modification to the elastic stress distribution as illustrated schematically in Fig.4 for the Ea/Eg=0.1 case.Distributions of shear stress of the types illustrated in Fig.4 have been obtained analytically and numerically,and measured in a range of instrumented laboratory and field tests on rock bolts,cable bolts and rock anchors(Kaiser et al.,1992;Benmokrane et al.,1995;Hyett et al.,1995;Woods and Barkhordari,1997;Ivanovi′c and Neilson,2009).The stress distribution has also been found to vary with imperfect bonding and when a discontinuity crosses the tensioned tendon or bolt(Zou,2004;Zhao and Yang,2011).A number of authors have shown how the nonuniform distribution of shear stress along the anchor length,including the effects of de-bonding,maybe modelled by piece-wise linear shear stress distributions(Jarred and Haber field,1997;Woods and Barkhordari,1997;Ivanovi′c and Neilson,2009;Ren et al.,2010).
Fig.4.Distribution of elastic shear stress along the grout-anchor interface(adapted from Coates and Yu(1970)).
In an analogous manner to the grout-tendon interface,the shear resistance at the rock-grout interface is developed by adhesion,friction and mechanical interlock with friction playing the major role after the other components have been overcome through initial relative axial displacement.As with the grout tendon interface,the ultimate rock-grout axial shear resistance is commonly evaluated as
where rgis the outside radius of the grouted annulus around the tendon,lbrgis the length of the rock-grout bond,andτrgu(z)is the shear resistance generated at distance z along the rock-grout interface.
Again,in common with design against grout-bond tendon failure,it is generally assumed that the shear resistance is distributed uniformly over the rock-grout bond length,lbrg,so that the ultimate shear resistance may be calculated as where a constant value ofτrguis assumed.Many Standards and Codes of Practice indicate that it is required,or at least preferable,that the value ofτrguused in design be based on the results of pullout tests of trial anchors installed at the site(see Section 6 below).However,it is still often selected on the basis of the rock type and condition using tables of presumptive values generally derived from those first published by Littlejohn and Bruce(1975-76,1977).Table 1 is a condensed version of the table given by Littlejohn(1992,1993)in which the sources of Littlejohn’s entries have been omitted.As shown in Table 1,working bond values are lower than ultimate values.Commonly,the working rock-groutshear strength is assumed to be approximately 10%of the uniaxial compressive strength(UCS)of the rock up to a maximum of 4.2 MPa.In some cases,the value is based on the grout compressive strength.Barley(1988)also estimated rock-grout bond strengths from the installation and testing of 10,000 anchors in a wide range of rock conditions in the United Kingdom.
This standard approach which has been used in several countries for several decades suffers from a number of deficiencies to be outlined in the following sub-section.
Deficiencies in the standard simplified approach to design against rock-grout interface failure have been found to include:·a uniform shear stress along the rock-grout interface is
assumed as discussed in Section 3.4 for the tendon-grout bond.As noted by Bruce(1997)in a review of the stabilisation of concrete dams by post-tensioned anchors in the U.S.A.,this approach using a uniform shear stress and “average”bond values can lead to“extraordinarily and wastefully long bond zones”;
·the wide-spread use of decades old,empirically-based,presumptive interface shear strengths based on rock type and condition and,more rarely,grout compressive strength(see Table 1);·as with the grout-tendon interface,no allowance is made for the influence of the normal stress acting on the grout-rock interface before and during shearing,its variation over the embedment length(Barley,1997),or the influence of grouting methods and pressures on the normal stresses generated(Park et al.,2013);
·no recognition is taken of the progressive nature of the rockgrout bond failure process in which at least three distinct stages may be identified-pseudo-elastic behaviour at small deformations,failure or de-bonding development at the rockgrout interface,and residual behaviour after larger displacements(Pease and Kulhawy,1984;Park et al.,2013);
·no allowance is made for the effects of structural features such as faults,shear zones and jointing in the rock mass or of other local variations in rock strength(Dados,1984;Zou,2004);
·the influence of the borehole roughness and diameter,and therefore the thickness of the grout annulus,are not considered;and
·the type of cement used in the grout can have a significant influence on the shear resistance generated(Haber field and Bay can,1997).
In dam engineering practice,the preferred way of overcoming some of these deficiencies is by the use of a necessarily average interface shear strength value established through full-scale pullout tests on trial anchors of the anticipated design,carried out in the rock mass concerned before the design is finalised(Scott and Bruce,1992;Feddersen,1997;Cavill,2000).In tests carried out for this purpose,it is important that the test configuration is selected to ensure that the failure occurs at the rock-grout interface.
Table 1Some rock-grout bond values recommended for use in design(after Littlejohn and Bruce(1975-76,1977);Littlejohn(1992,1993)).
Fig.5.Cone geometries used in uplift capacity calculations for single tensioned anchors(after Littlejohn and Bruce(1975-76,1977),Hobst and Zajíc(1977)and Littlejohn(1993)).
Although it is generally found to be conservative,from a rock mechanics or rock engineering perspective,the commonly-used or standard approach to the design of post-tensioned anchors against rock mass failure by uplift(Mode D),is probably the least satisfactory of the design approaches discussed in this paper.
As illustrated in Fig.5 for the case of a single anchor,the simplest standard approach assumes that the uplift force generated by the post-tensioned anchor is resisted by the weight of a cone of homogeneous rock.It generally ignores the fact that for uplift to occur,not only the weight of the rock cone,but also the shear and/or tensile strength of the rock mass must be overcome.Depending on the nature of the anchorage and the assumed properties of the rock mass,the cone angle and the location of the apex of the cone may vary.Fig.5 illustrates the commonly assumed cases in which the cone angle is either 60°or 90°,and the apex of the cone is located at the mid-point or at the distal end of the grouted embedment length.Some designers may also locate the apex of the cone at the proximal or upper end of the bonded length.A cone angle of 60°is usually used if the rock mass is soft,heavily fissured or weathered,with an angle of 90°being used for all other rock mass conditions(Hobst and Zajíc,1977;Littlejohn,1993)which is generally the case for concrete dam strengthening or stabilisation.For grouted anchors of the type being considered here,the apex of the cone is usually taken to be at the mid-point of the grouted anchor length.This assumption with a 90°cone angle has been used in dam engineering at least since the 1950s(Morris and Garrett,1956;Banks,1957).
For a general cone angle ofθc(θc=60°or 90°in Fig.5)and the apex of the cone located at the mid-point of the grouted embedment length,the uplift force required to over come the weight of the cone of rock,Wc,may be calculated as whereγis the unit weight of the rock,D is the depth from the surface to the top or proximal end of the embedment length,and L is the grouted embedment or bond length.Although it is more conservative to use the full unit weight of the rock in this calculation,in some applications in dam engineering the buoyant or submerged unit weight should be used.Commonly in design,the required bond length,L,is calculated by equating the rock-grout bond resistance given by Eq.(5)to the uplift force required to overcome the weight of the cone of rock given by Eq.(6)and applying a factor of safety,often taken to be 2.
In the author’s experience,this simple,conservative approach is generally used in dam engineering in the dimensioning of large post-tensioned anchors against failure of the rock mass by uplift.However,two modifications may be made to allow more realistically for the circumstances and conditions met in practice.
Firstly,for major applications such as the anchoring of concrete dams in the manner illustrated in Fig.2a and the anchoring of dam toes,spillways and training walls,anchors are generally installed in rows at relatively close spacings of a few metres.In these cases,cones such as those illustrated in Fig.5 will overlap or interact as shown conceptually in two dimensions in Fig.6a.In this case,the calculation of the weight of the cone given by Eq.(6)may be replaced by a simple approximate 2D calculation assuming a triangular cross-section to give the uplift resistance available per unit length along the row of anchors as where s is the spacing of anchors along the row.
An important practical case arises when the rock mass contains sub-horizontal bedding or structural features including jointing.In this case,the anchorage horizons within a row of anchors may be staggered vertically such that the tendency to uplift a volume of rock defined by the one sub-horizontal plane is avoided(Xu and Benmokrane,1996).In the writer’s experience,this practice has been used when the dam is founded on igneous rock in which sheeting jointing has developed in an incised river valley.
Secondly,in the calculations of uplift resistance in a range of applications,some authorities and authors seek to allow for the tensile or shear strength of the rock mass,generally through the use of assumed values of rock mass tensile strength,shear strength or cohesion(Coates,1970;Hobst and Zajíc,1977;Anon,1996;Kim and Cho,2012).The estimated values of tensile or shear resistance may be used either instead of,or in addition to,the resistance to uplift provided by the weight of the cone of rock.In presenting approaches of this type,some authors use idealised 2D representations with a triangular section as shown in Fig.6b rather than the 3D cone.For example,Hobst and Zajíc(1977)gave a number of solutions in terms of the rock mass shear strength.Following Coates and Yu(1971),Kim and Cho(2012)suggested that the tensile resistance on the failure surface of the rock cone in Fig.5,fr,is given by whereσtris the tensile strength of the rock mass and Dcis the depth of the rock cone,equal to D+L/2 in Fig.5.
Fig.6.Interaction of uplift cones in a single row of tensioned anchors.(a)A vertical section along the row of anchors(after Littlejohn(1993));and(b)a simplified triangular cross-section normal to the row(after Hobst and Zajíc(1977)).
Of course,this approach begs the question of the exact physical meaning of the assumed parameter,σtr,and how it might best be estimated.In an alternative approach,Weerasinghe and Adams(1997)proposed the use of a rock mass shear strength,rather than a tensile strength,back-calculated from the results of pull-out tests,assuming a theoretical failure cone of the type being discussed here.Clearly,the use of this approach to estimate rock mass shear strength would be impracticable for the very high-capacity,large-scale anchors such as those described by Cavill(1997,2000)now being used in dam engineering,not least because it is difficult to understand how the assumed failure mechanism could develop in most practical circumstances.This and related issues will be discussed in more detail in Section 5.2 to follow.
As with the approaches used to design against grout-tendon(Mode B)and rock-grout(Mode C)bond failures discussed previously,from a rock mechanics and rock engineering perspective,the commonly-used approach to design against rock mass uplift(Mode D)failure assuming a conical uplift failure mechanism,suffers from a number of deficiencies.The major rock mechanics and rock engineering deficiencies will be discussed briefly below in terms of the implicitly assumed stress distribution imposed within the rock mass,the rock mass uplift failure mechanism,the influence of the rock mass structure,and the assumed uniform values of rock mass tensile and/or shear strengths.
5.2.1.Stress distribution induced in the overlying rock mass
If failure of,or large deformations in,a rock mass influenced bya single anchor or a system of post-tensioned anchors is to be assumed,knowledge is required of the distribution of stresses induced in the rock mass by the anchor and other means.In many cases,concrete dams are constructed in or across incised valleys or gorges.In these cases,the major principal in situ stress near the surface is likely to be oriented parallel to the valley surface.In the cases illustrated in Figs.5 and 6,the weight of the rock and the transfer of stress from the tensioned anchor to the rock mass must also be considered in calculating the distribution of stresses within the rock mass around and above the anchor(s).In many cases,the rock mass can be expected to have anisotropic elastic properties.In the case of a deep,post-tensioned anchor loaded through a surface bearing plate,a bulb of compressive vertical stress will be induced in the rock mass around the anchor head,and the stress distribution around the anchor embedment length at some depth can be expected to be quite complex and non-uniform.Furthermore,it must be expected that the final induced stress distribution will be influenced by weathering profiles,changes in rock type and any major structural features transecting the section of the rock mass influenced by the anchor-related stresses.Because of this range of influences,it is not easy to conceptualise a general pattern of stress induced in the rock mass by a single,deep,post-tensioned anchor or by a system of deep,post-tensioned anchors that is likely to lead to a conical failure surface.
The assumption of a cone of failure discussed in Section 5.1 implies that either the tensile or shear strengths of the rock mass,or both,must be overcome over the surface of the cone before uplift can occur.If,as is usually the case,it is assumed that the shear and tensile strengths of the rock mass are constant over any given depth,this implies,in turn,that the shear and/or tensile stresses induced in the rock mass must reach their maxima along some cone-like surface(in the case of a single anchor).While,as will be discussed in Section 5.2.2 below,it can be readily envisaged that this will occur in the case of a short anchor that is grouted to,or close to,the surface,it is more difficult to understand why this should be the case when the anchor is grouted only over an embedment length,L,which is often significantly less than D,the depth below the ground surface of the proximal end of the grouted length.In the first instance,the distribution of induced elastic stresses could be investigated through a series of relatively simple numerical stress analyses of sample problem configurations.
5.2.2.Rock mass uplift failure mechanism
Most direct observations of the rock mass uplift failure mechanism of which the author is aware,were associated with field pullout tests in which,almost of necessity,the anchor was short in comparison to the lengths of the large post-tensioned anchors used in dam construction and rehabilitation projects,and the anchor was grouted to,or close to,the ground surface(Dados,1984;Benmokrane et al.,1995;Carter,1995;Weerasinghe and Littlejohn,1997;Serrano and Olalla,1999;Thomas-Lepine,2012).Furthermore,in some of these cases,the test anchor was installed in near-surface,weak rock.
A number of such investigations have found that while discernible surface uplift extends for some distance laterally from the anchor borehole,the limit of“significant”uplift can be represented reasonably well by a 90°cone.For example,Fig.7 shows the failure mechanism observed and inferred by Weerasinghe and Littlejohn(1997)for a straight shafted anchor grouted to the ground surface in a weak mudstone and subjected to uplift.The test anchor was composed of a seven 15.2 mm 7-wire drawn strand tendon with nodes in the fixed anchor length to reduce the possibility of grout-tendon failure.Weerasinghe and Littlejohn(1997)noted that the central cone at the top of the anchor was formed by rock mass failure in shear.It is suggested that the failure mechanism would be quite different if the same anchor was installed in the same rock mass in a configuration such as that shown in Fig.5 with the relatively high values of D/L used in modern dam engineering practice.
5.2.3.Influence of rock mass structure
Clearly,the structure of the rock mass will influence the shape of the “failure”surface.Dados(1984),Wyllie(1999)and Thomas-Lepine(2012),amongothers,have shown how horizontal bedding or jointing and vertical cross-jointing can have a major influence on the observed uplift failure mechanism in near-surface anchors.Similarly,a set of persistent,inclined discontinuities can exert a controlling influence on the failure surface geometry.In general,rock masses having the main discontinuity set perpendicular to the anchor axis are the most suitable in which to fix anchors(Hobst and Zajíc,1977).Fig.8 shows some simple representations of possible influences of rock mass structure for the case of a shallow anchor that is fully grouted to the ground surface.In a number of the shallow anchor cases illustrated in Figs.7 and 8,it is easy to postulate a conical or pseudo-conical failure surface,remembering that the in situ problem is 3D and not 2D as shown in the sketches of Figs.7 and 8.
Fig.7.Failure by uplift of a fully grouted,straight-shafted,shallow,tensioned anchor in weak mudstone(Weerasinghe and Littlejohn,1997).
It appears reasonable to suggest that,in the cases of the deep anchors used in dam engineering,the near-surface rock mass structure may not exert the same immediate controlling influence,and the 90°uplift cone assumption may not be as valid,as in the shallow anchor case.In any event,the deeper the anchor,or the greater the ratio of the anchor depth,D,to the embedment length,L,in Fig.5,the less likely the conical rock mass uplift mechanism is to control the behaviour of the post-tensioned anchor.Weerasinghe and Littlejohn(1997)argued that,for fully grouted anchors,as anchorage depth increases,the resistance of the rock mass cone will become smaller compared to the shaft(grout-rock)resistance.Numerical experiments using discrete element codes provide perhaps the most promising means of exploring potential failure mechanisms of deep anchors in rock masses for which rock mass structure models or discrete fracture network(DFN)simulations are available(Panton et al.,2014).Ideally,numerical analyses of this type should be 3D rather than 2D.
Fig.8.Influence of rock mass structure on the uplift failure mechanism of a shallow,fully grouted,tensioned anchor(after Wyllie(1999)).
As was noted at the end of Section 5.1,in dam engineering,the potential influence of a continuous or near-continuous horizontal or sub-horizontal structural feature such as a bedding plane or sheeting joint can be reduced by staggering the elevations of the anchorlengths of adjacent anchors in a row.In either the shallow or deep anchor case,or in the case of a row of anchors as illustrated in Fig.6,it must be recognised that,as shown by a range of pull-out tests and by preliminary numerical simulations carried out by Panton et al.(2014),the rock mass uplift failure mechanism will be progressive.
5.2.4.Estimation of rock mass shear and/or tensile strengths
Existing design approaches using the 90°or 60°uplift cone hypotheses,variously assume shear,cohesive and/or tensile strengths of the rock mass which may be the presumptive values or be back-calculated from the results of pull-out tests using a“theoretical”failure cone(Hobst and Zajíc,1977;USACE,1995;Weerasinghe and Adams,1997).Clearly,these simple approaches do not take into account the variability of the governing strength parameters with depth and with varying local rock mass structure,or the progressive and complex nature of the rock mass failure mechanisms involved.Nordo they always allow for the influence of the total distribution of stresses within the rock mass.It is suggested that these simplistic approaches can,and should,be improved.
At the end of Section 3.1,it was noted that linear and nonlinear static and dynamic numerical stress analyses(Alonso et al.,1996;Yu et al.,2005;Bureau et al.,2007;Scott and Mills-Bria,2008;Lemos,2011,2014;Chopra,2012),limit state(Merrifield et al.,1997;Herweynen,1998;ANCOLD, 2013;Farrell,2013), reliability,riskbased,probabilistic and fragility methods(Ellingwood and Tekie,2001;Phoon et al.,2003;Barker,2011;Westberg Wilde and Johansson,2013)are now being used for dam design analysis and assessment.These approaches may be used when analysing the overall stability of dams stabilised by post-tensioned anchors in the manner illustrated schematically in Fig.2.As well as the traditional limiting equilibrium analyses,numerical stress analysis methods may use continuum,equivalent continuum or discontinuum methods.As was indicated in Section 5.2.3 and has been demonstrated by Panton et al.(2014),numerical methods,particularly discontinuum methods used in conjunction with a structural or DFN model of the rock mass concerned,potentially provide a powerfulmeans of investigating the likely responses of rock masses to the uplift imposed by post-tensioned anchors.Provided adequate input data are available(see Section 6.1 below),these methods can also allow the influence of the in situ stresses and the stresses induced in the rock mass to be evaluated more rationally and more fully than does the standard design approach discussed in Section 5.1.However,in the author’s experience,detailed design analyses of this proposed type are rarely carried out in practice.
Although the previous discussion concerned Mode D or rock mass uplift failure,it should also be noted that,for any given case,comprehensive numerical analyses can be used to improve the methods generally used to estimate the distribution of normal and shear stresses along tendon-grout and rock-grout interfaces and to evaluate the onset and progression of interface bond failure and slip.Although this may appear to be relatively straight-forward,for its complete numerical analysis,this problem requires the evaluation and input of a number of rock and grout properties,including stiffnesses.As noted in Section 3.4,historically a significant number of analyses of this type have been carried out for rock and cable bolts and for shallow or near-surface anchors,but to the best of the author’s knowledge rarely,if at all,for the large post-tensioned anchors currently being used for dam stabilisation.
As discussed in Section 5.2,there are a number of problem configurations for which the 60°or 90°uplift cone assumptions do not provide realistic models for use in design analysis.In a range of other geotechnical engineering applications,including some involving anchored structures,the upper and lower bound theorems of limit state theory have been used to identify likely failure mechanisms and the associated limit loads(Sloan,1989,2013;Regenass and Soubra,1997;Soubra and Regenass,1997).In these geotechnical engineering applications,numerical methods,notably finite element methods,including large deformation finite element methods,have been used in conjunction with limit state analysis to obtain solutions to otherwise intractable problems(Sloan,1989,2013;Wang et al.,2013).It is suggested that such an approach could be used to good effect to identify potential rock mass uplift conditions associated with the use of large post-tensioned anchors to stabilise or strengthen dams.
The major rock mechanics and rock engineering issues associated with the design of post-tensioned rock anchors for concrete dams have been discussed in the preceding sections of this paper.However,in order to ensure acceptable performance of the anchors and of the structures that they are intended to stabilise or reinforce,a range of other site investigation,design and construction issues associated with the anchors have to be planned and executed satisfactorily.To discuss all of them in detail would extend the scope of this paper beyond reasonable limits.However,for completeness,they will be referred to briefly here.These issues include:
·site investigation and characterisation;
·the installation and testing of trial anchors;
·grout design and grouting trials;
·the fabrication,installation,tensioning and possibly retensioning of the anchors;
·the provision of corrosion protection to the anchors and anchor heads;and
·the in service monitoring and maintenance of anchors and their fittings.
Many of these issues are covered by Standards,Codes of Practice and Guidelines.Some of them will be discussed briefly below.
As the author has argued elsewhere(Brown,2011),the design and construction of large dams played a significant role in the development of rock mechanics and rock engineering knowledge and techniques that took place in the middle decades of the 20th century.This applied particularly to site investigation methods and to the assessment of the mechanical properties of rocks and rock masses,including discontinuities.In modern dam engineering,adequate site investigation and the resulting site characterisation,and geological,structural and geotechnical model development remain of paramount importance.In terms of the various types of design analyses discussed in this paper,particular site characterisation requirements include:
·estimating the in situ stresses at the dam site,particularly under incised valleys;
·mapping discontinuities in the foundation rock mass and developing complete 3D structural models for the geotechnical domains identified,preferably using a DFN approach;
·estimating rock and rock mass strengths and deformabilities;
·measuring or estimating the basic friction angles,roughnesses and normal and shear stiffnesses of persistent discontinuities likely to be involved in the sliding mode of failure illustrated in Fig.2b;
·establishing design values of the shear and tensile strengths of old and new foundation rock-mass concrete interfaces(Lo et al.,1991;EPRI,1992);and
·measuring or estimating rock mass permeabilities and identifying significant water-bearing discontinuities in the foundation(Farinha et al.,2011).
Examples of some of the modern approaches and techniques used to obtain data of these types are given by Brown and Marley(2008),Powell et al.(2008),Shaffner et al.(2009),Friz et al.(2011),Hencher et al.(2011)and Agharazi et al.(2012).
It is essential that before the detailed design of a system of large,post-tensioned anchors is completed,trial anchors of prototype size should be installed in the rock mass concerned and load tested.This overall process should include tests of drilling accuracy and drill hole stability in the candidate rock mass;tests of proposed grout mixes and grouting tests to enable suitable grouting pressures to be determined and the extent of the likely loss of grout into the surrounding rock mass to be assessed;and,perhaps most importantly,load testing of a generally small number of trial anchors for a range of possible purposes,including the identification of potential failure mechanisms and,with suitable test design,the estimation of mean rock-grout interface strengths.As will be discussed in Section 6.4 to follow,it is also common or required practice to test load each prototype anchor on installation and subsequently during the anchor’s service life.Examples of anchor testing procedures and results are given by Habib(1989),Scott and Bruce(1992),Littlejohn(1993),Bruce(1997),Feddersen(1997)and Cavill(2000).
The initial anchor stressing and proof-testing,and the inspection,monitoring,maintenance and re-stressing of anchors during their service lives,are critically important in ensuring the satisfactory in service performance of post-stressed anchor systems.As Littlejohn(1993)noted,“stressing is required to fulfil two functions.(i)Totensionthe tendon and to anchor it at its secure load.(ii)To ascertain and record the behaviour of the anchorage so that it can be compared with the behaviour of control anchorages,subjected to on-site suitability tests.”The structural design of the anchor stressing system,including the load cell,anchor head and bearing plate,is an important element of this undertaking(Littlejohn,1993).As was noted in Section 3.3,during installation of the anchor,it is common practice in Australia to test load the anchor and fittings beyond the normal WL(for example,up to 78%-80%MBL)and to “lock-off”the load with sufficient allowance above the WL(for example,to 68%-72%MBL)to allow for subsequent load losses caused by creep,relaxation and draw-in(ANCOLD,1992).Following this initial stressing,it is necessary to protect the anchor head against corrosion while ensuring that it remains accessible for subsequent inspection and re-stressing(Littlejohn and Mothersille,2007).
The volume edited by Littlejohn(2007)contains a wide range of papers on the in service inspection,maintenance and monitoring of ground anchors and anchored structures,including dams(Aschenbroich,2007;Wolfhope et al.,2007;Zicko et al.,2007).
High-capacity,post-tensioned anchors have found wide-spread use,originally in initial dam design and construction,and more recently in the strengthening and rehabilitation of concrete dams to meet modern design and safety standards.Despite the advances that have been made in rock mechanics and rock engineering during the almost 80 years in which post-tensioned anchors have been used in dam engineering,the author’s reading of the literature,and his own practical experience in Australia,suggest that some aspects of the rock mechanics and rock engineering design of rock anchors for dams have changed relatively little over the last 30 or 40 years.This applies,in particular,to the calculations usually carried out to establish the grouted embedment lengths required for deep,post-tensioned anchors.These calculations usually make simplified assumptions about the distribution and values of rockgrout interface shear strengths,the shape of the volume of rock likely to be involved in uplift failure under the influence of a system of post-tensioned anchors,and the mechanism of that failure.The resulting designs are generally conservative.While this is understandable for important structures like dams for which public safety is a major consideration,in some cases,the degree of conservatism is considered to be excessive and to represent poor engineering practice.
It is concluded that the aspects of rock mechanics and rock engineering design of large,post-tensioned rock anchors for dams of major concern here,the rock-grout bond and the uplift failure mechanism,can be significantly improved by making greater use of modern,comprehensive,numerical analyses in conjunction with 3D models of the rock mass structure,realistic rock and rock mass properties,and the results of prototype anchor tests in the rock mass concerned.
The author has no known conflict of interest associated with this review paper.
The author wishes to thank those who gave him the opportunity to become involved in dam engineering at a relatively late stage of his career,and those with whom he has worked on projects and discussed the issues addressed in this paper.They include:Brian Cooper,Peter Foster,Tim Griggs,Richard Herweynen,Mike Marley,Peter Richardson and Richard Rodd.He would also thank the management and Principals of the Brisbane office of Golder Associates for facilitating his work in dam engineering and supporting the preparation of this paper;Mike Marley and Rob Morphet for internally reviewing of the paper;Guy Green for preparing the drawings;and Jo-Anne Sandilands for her word processing assistance.
Agharazi A,Tannant DD,Martin CD.Characterizing rock mass deformation mechanisms during plate load tests at the Bakhtiary project.International Journal of Rock Mechanics and Mining Sciences 2012;49(1):1-11.
Alonso E,Carol I,Delahaye C,Gens A,Prat P.Evaluation of safety factors in discontinuous rock.International Journal of Rock Mechanics and Mining Sciences 1996;33(5):513-37.
ANCOLD.Guidelines on design criteria for concrete gravity dams.Australian National Committee on Large Dams(ANCOLD);1991.
ANCOLD.Guidelines on strengthening and raising concrete gravity dams.Australian National Committee on Large Dams Working Group;1992.
ANCOLD.Draft guidelines on design criteria for concrete gravity dams.Australian National Committee on Large Dams;2013[unpublished].
Anon.Rock foundations-technical engineering and design guidelines as adapted from the USAr my Corps of Engineers,No.16.New York:ASCE Press;1996.129pp.
Aschenbroich H.Case histories of high capacity anchors for two dams in Canada involving long term monitoring.In:Littlejohn GS,editor.Ground anchorages and anchored structures in service,Proceedings of the International Conference,London.London:Thomas Telford;2007.p.144-54.
Banks JA.Allt-na-Lairige prestressed concrete dam.Proceedings of the Institution of Civil Engineers 1957;6(3):409-28.
Barker M.Australian risk approach for assessment of dams.In:21st century dam design-advances and adaptations,proceedings of the 31st Annual USSD Conference,San Diego.Denver:US Society on Dams;2011.p.69-91.
Barley AD.Ten thousand anchorages in rock.Ground Engineering 1988;21(6):20-9.21(7):24-35;21(8):35-9.
Barley AD.Properties of grouts in a confined state.In:Littlejohn GS,editor.Ground anchorages and anchored structures,Proceedings of the International Conference,London.London:Thomas Telford;1997.p.13-22.
BC Hydro.Guidelines for the assessment of rock foundations of existing concrete gravity dams.BC Hydro Report No.MEP67,Vancouver,Canada.1995.
Bedi A,Orr TLL.On the applicability of the Eurocode 7 partial factor method for rock mechanics.In:Alejano LR,Perucho A,Olalla C,Jiménez R,editors.Rock engineering and rock mechanics:structures in and on rock,Proceedings of Eurock 2014,ISRM European Regional Symposium,Vigo.Leiden:CRC Press/Balkema;2014.p.1517-23.
Benmokrane B,Chekired M,Xu H.Monitoring behavior of grouted anchors using vibrating wire gauges.Journal of Geotechnical Engineering,ASCE 1995;121(6):466-75.
Bianchi RH,Bruce DA.The use of post-tensioned anchorages on the arch portion of Stewart Mountain Dam.In:Anderson LR,editor.Geotechnical practice in dam rehabilitation.Geotechnical Special Publication No.35.New York:American Society of Civil Engineers;1993.p.791-802.
Bretas EM,Léger P,Lemos JV.3D stability analysis of gravity dams on sloped rock foundations using the limit equilibrium method.Computers and Geotechnics 2012;44:147-56.
Bretas EM,Léger P,Lemos JV,Lourenço PB.Analysis of a gravity dam considering the application of passive reinforcement.In:Garcia RR,Mir MA,Bitrian FH,Dios RL,Caballero MRC,editors.Dam maintenance and rehabilitation II,Proceedings II International Congress on Dam Maintenance and Rehabilitation,Zaragoza.Leiden:CRC Press/Balkema;2010.
Brown ET.Fifty years of the ISRM and associated progress in rock mechanics.In:Qian Q,Zhou YX,editors.Harmonising rock engineering and the environment,Proceedings of the 12th Congress,International Society for Rock Mechanics,Beijing.Leiden:CRC Press/Balkema;2011.p.29-43.
Brown ET,Marley M.Estimating rock mass properties for stability analyses of new and existing dams.In:Proceedings of the Symposium on Operation,Rehabilitation and Up-grading of Dams,ICOLD 76th Annual Meeting,So fia;2008.Paper 2-48(on CD-ROM).
Bruce DA.Practical aspects of rock anchorages for dams.In:Dam safety in the states:Proceedings of the Association of State Dam Safety Of ficials Fifth Annual Conference,Manchester,New Hampshire;1988.
Bruce DA.The stabilization of concrete dams by post-tensioned rock anchors:the state of American practice.In:Littlejohn GS,editor.Ground anchorages and anchored structures,Proceedings of the International Conference,London.London:Thomas Telford;1997.p.508-21.
Bruce D,Wolfhope J.Rock anchors for North American dams:The National Research Program bibliography and data base.In:Littlejohn GS,editor.Ground anchorages and anchored structures in service,Proceedings of the International Conference,London.London:Thomas Telford;2007.p.121-31.
Bruce D,Wolfhope J.40 years of rock anchors for dams in North America-lessons learned.In:The sustainability of experience-investing in the human factor,Proceedings of the 28th Annual USSD Conference,Portland.Denver:US Society on Dams;2008.p.47-56.
Bureau G,Keller TO,Zhou J.Nonlinear structural analysis for San Vicente Dam raise.In:Modernization and optimization of existing dams and reservoirs,Proceedings of the 27th Annual USSD Conference,Philadelphia.Denver:US Society on Dams;2007.p.405-19.
Carter TG.Observations on cone pull-out anchor behaviour in very weak rock.In:Widmann R,editor.Anchors in theory and practice,Proceedings of the International Symposium on Anchors in Theory and Practice,Salzburg.Rotterdam:A.A.Balkema;1995.p.17-23.
Cavill BA.Very high capacity ground anchors used in strengthening concrete gravity dams.In:Littlejohn GS,editor.Ground anchorages and anchored structures,Proceedings of the International Conference,London.London:Thomas Telford;1997.p.262-71.
Cavill BA.Full scale testing of a 2400 tonne capacity rock anchor.ANCOLD Bulletin No 114.April 2000.p.213-23.
CDSA.Dam safety guidelines.Canadian Dam Safety Association;1999.
CEN(European Committee for Standardisation).Geotechnical design:part 1,general rules.EN-1997-1.Brussels:CEN;2004.
Chopra AK.Earthquake analysis of arch dams:factors to be considered.Journal of Structural Engineering,ASCE 2012;138(2):205-14.
Coates DF.Rock mechanics principles.Mines branch monograph 874.Ottawa:Information Canada;1970.
Coates DF,Yu YS.Three-dimensional stress distributions around a cylindrical hole and anchor.In:Proceedings of the 2nd Congress,International Society for Rock Mechanics,Belgrade,3;1970.p.175-82.
Coates DF,Yu YS.Rock anchor design mechanics.Research Report No R233.Mines Branch,Canadian Department of Energy,Mines and Resources;1971.
Dados AT.Design of anchors in horizontally jointed rocks.Journal of Geotechnical Engineering,ASCE 1984;110(11):1637-47.
DEWS.Guidelines on acceptable flood capacity for water dams.State of Queensland:Department of Energy and Water Supply;2013.
Dickson PD,Loar TN.Abutment stability analyses and design solutions for Tekeze Dam,Ethiopia.In:Proceedings of the 45th US Rock Mechanics/Geomechanics Symposium,San Francisco;2011.Paper 11-315(on CD-ROM).
Duffaut P.The traps behind the failure of Malpasset arch dam,France,in 1959.Journal of Rock Mechanics and Geotechnical Engineering 2013;5(5):335-41.
Ebeling RM,Nuss LK,Tracy FT,Brand B.Evaluation and comparison of stability analysis and uplift criteria for concrete gravity dams by three federal agencies.Report ERDC/ITL TR-00-1.Information Technology Laboratory,U.S.Army Engineer Research and Development Center;2000.
Ellingwood B,Tekie PB.Fragility analysis of concrete gravity dams.Journal of Infrastructure Systems,ASCE 2001;7(2):41-8.
EPRI.Uplift pressures,shear strengths and tensile strengths for stability analysis of concrete dams,vol.1.Palo Alto:Electric Power Research Institute;1992.Report TR-100345.
Farinha MLB,Lemos JV,Maranha das Neves E.Numerical modelling of borehole water-in flow tests in the foundation of the Alqueva arch dam.Canadian Geotechnical Journal 2011;48(1):72-88.
Farmer IW.Stress distribution along a resin grouted anchor.International Journal of Rock Mechanics and Mining Sciences and Geomechanics Abstracts 1975;12(11):347-52.
Farrell ER.Harmonisation of anchor design within Eurocode.In:Arnold P,Fenton GA,Hicks MA,Schweckendiek T,Simpson B,editors.Modern geotechnical design codes of practice:implementation,application and development.Amsterdam:IOS Press;2013.p.15-24.
Feddersen I.Improvement of the overall stability of a gravity dam with 4500 kN anchors.In:Littlejohn GS,editor.Ground anchorages and anchored structures,Proceedings of the International Conference,London.London:Thomas Telford;1997.p.318-25.
Fell R,MacGregor P,Stapledon D,Bell G.Geotechnical engineering of dams.Leiden:A.A.Balkema;2005.
Friz PC,Curtis D,Rutherford JH,Hart S,Johnston DC,Orbison D.Blue Lake Dam left abutment geological modelling for dam raise.In:21st century dam designadvances and adaptations,Proceedings of the 31st Annual USSD Conference,San Diego.Denver:US Society on Dams;2011.p.147-61.
Gosschalk EM,Taylor RW.Strengthening of Muda Dam foundation using cable anchors.In:Proceedings of the 2nd Congress,International Society for Rock Mechanics,Belgrade3.Rotterdam:A.A.Balkema;1970.p.205-10.
Haber field CM,Baycan S.Field performance of the grout/rock interface in anchors.In:Littlejohn GS,editor.Ground anchorages and anchored structures,Proceedings of the International Conference,London.London:Thomas Telford;1997.p.45-54.
Habib P,editor.Recommendations for the design calculation,construction and monitoring of ground anchors.Rotterdam:A.A.Balkema;1989.
Hanna TH.Foundations in tension:ground anchors.Clausthal:Trans Tech Publications and New York:McGraw-Hill.1982.
Harman T,Herweynen R,Gosh M.Analysis and design challenges associated with the Catagunya Dam Restoration Project.In:Dam decisions:past experiences,future challenges,Proceedings of the ANCOLD 2010 Conference,Hobart;2010.15 pp.(on CD-ROM).
Harrison JP.Eurocode 7 and rock engineering:current problems and future opportunities.In:Alejano LR,Perucho A,Olalla C,Jiménez R,editors.Rock engineering and rock mechanics:structures in and on rock,Proceedings of Eurock 2014,ISRM European Regional Symposium,Vigo.Leiden:CRC Press/Balkema;2014.p.1531-6.
Hencher SR,Lee SG,Carter TG,Richards LR.Sheeting joints:characterisation,shear strength and engineering.Rock Mechanics and Rock Engineering 2011;44(1):1-22.
Herweynen RI.Safety of Meadowbank Dam against sliding parameter uncertainty.ANCOLD Bulletin No.112.August 1998.p.77-87.
Hobst L,Zajíc J.Anchoring in rock.Amsterdam:Elsevier;1977.
Hyett AJ,Bawden WF,Macsporran GR,Moosavi M.A constitutive law for bond failure of fully-grouted cable bolts using a modified Hoek cell.International Journal of Rock Mechanics and Mining Sciences 1995;32(1):11-36.
Ivanovi′c A,Neilson RD.Modelling of debonding along the fixed anchor length.International Journal of Rock Mechanics and Mining Sciences 2009;46(4):699-707.
Jarred DJ,Haber field CM.Tendon/grout interface performance in grouted anchors.In:Littlejohn GS,editor.Ground anchorages and anchored structures,Proceedings of the International Conference,London.London:Thomas Telford;1997.p.262-71.
Kaiser PK,Yazici S,Nosé J.Effect of stress change on the bond strength of fully grouted cables.International Journal of Rock Mechanics and Mining Sciences 1992;29(3):293-306.
Khaoua M,Montel B,Civaro A,Luga A.Cheurfas Dam anchorages:30 years of control and recent reinforcement.In:Proceedings of the 7th International Conference on Soil Mechanics and Foundation Engineering,Mexico City Specialty Session 15;1969.p.167-71.
Kim HK,Cho NJ.A design method to incur ductile failure of rock anchors subjected to tensile loads.Electronic Journal of Geotechnical Engineering 2012;17:2737-46.
Kline RA,Howard B,Davidheiser SM.Current state-of-the-art for existing gravity dam stability analysis.In:Modernization and optimization of existing dams and reservoirs,Proceedings of the 27th Annual USSD Conference,Philadelphia.Denver:US Society on Dams;2007.p.341-51.
Lamas L,Perucho A,Alejano LR.Some key issues regarding application of Eurocode 7 to rock engineering design.In:Alejano LR,Perucho A,Olalla C,Jiménez R,editors.Rock engineering and rock mechanics:structures in and on rock,Proceedings of Eurock 2014,ISRM European Regional Symposium,Vigo.Leiden:CRC Press/Balkema;2014.p.1459-64.
La Villa G,Golser J.Slopes of the Tarbela Dam Project.Rock Mechanics 1982;(Suppl.12):179-90.
Lawrence MS,Martin CD.Estimating rock mass strength for a concrete dam founded on good rock:Blind Slough Dam,British Columbia,Canada.In:Eberhardt E,Stead D,Morrison T,editors.Rock mechanics:meeting society’s challenges and demands,Proceedings of the 1st Canada-US Rock Mechanics Symposium,Vancouver2.London:Taylor and Francis;2007.p.1007-14.
Lemos J.Discontinuum models for dam foundation failure analysis.In:Qian Q,Zhao YX,editors.Harmonising rock engineering and the environment,Proceedings of the 12th Congress,International Society for Rock Mechanics,Beijing.Leiden:CRC Press/Balkema;2011.p.91-8.
Lemos JV.Representation of rock discontinuities in safety analysis of large dams.In:Alejano LR,Perucho A,Olalla C,Jiménez R,editors.Rock engineering and rock mechanics:structures in and on rock,Proceedings of Eurock 2014,ISRM European Regional Symposium,Vigo.Leiden:CRC Press/Balkema;2014.p.29-38.
Liang J.Development and problems of prestressed anchor cables for geotechnical engineering in China.ISRM News Journal 1995;2(3-4):10-7.
Littlejohn GS.Overview of rock anchorages.In:Hudson JA,Brown ET,Fairhurst C,Hoek E,editors.Comprehensive rock engineering4.Oxford:Pergamon Press;1993.p.413-50.
Littlejohn GS.Rock anchorage practice in civil engineering.In:Kaiser PK,McCreath DR,editors.Rock support in mining and underground construction,Proceedings of the International Symposium on Rock Support,Sudbury.Rotterdam:A.A.Balkema;1992.p.257-68.
Littlejohn GS,editor.Ground anchorages and anchored structures:Proceedings of the International Conference,London.London:Thomas Telford;1997.
Littlejohn GS,editor.Ground anchorages and anchored structures in service:Proceedings of the International Conference,London.London:Thomas Telford;2007.
Littlejohn GS,Bruce DA.Rock anchors:state of the art.Ground Engineering 1975-76;8(3):25-32.8(4):41-8;8(5):34-45;8(6):36-45;9(2):20-9;9(3):55-60;9(4):33-44.
Littlejohn GS,Bruce DA.Rock anchors-design and quality control.In:Fairhurst C,Crouch SL,editors.Design methods in rock mechanics,Proceedings of the 16th Symposium on Rock Mechanics,Minneapolis.New York:ASCE;1977.p.77-88.
Littlejohn GS,Mothersille D.Maintenance testing and service behaviour monitoring of permanent ground anchorages.In:Littlejohn GS,editor.Ground anchorages and anchored structures in service:Proceedings of the International Conference,London.London:Thomas Telford;2007.p.1-16.
Liu X,Zhou Y,Chen C,Zheng Y,Xia K.Anchoring characteristic of tension-type anchor cable and grout length design.In:Feng XT,Hudson JA,Tan F,editors.Rock characterisation,modelling and engineering design methods,Proceedings of the 3rd ISRM SinoRock Symposium,Shanghai.Leiden:CRC Press/Balkema;2013.p.697-702.
Lo KY,Ogawa T,Lukajic B,Dupak DD.Measurements of strength parameters of concrete-rock contact at the dam-foundation interface.Geotechnical Testing Journal 1991;14(4):383-94.
Lombardi G.3-D analysis of gravity dams.Hydropower and Dams 2007;1:98-102.Lowe J,Chao PC,Leucker AR.Tarbela service spillway plunge pool development.Water Power and Dam Construction 1979;31(11):85-90.
Maddox JM,Kinstler FL,Mather RP.Meadowbank Dam-foundations.Civil Engineering Transactions,Institution of Engineers,Australia 1967;9(2):321-9.
Merrifield CM,Barley AD,Von Matt U.The execution of ground anchor works:the European Standard prEN1537.In:Littlejohn GS,editor.Ground anchorages and anchored structures:Proceedings of the International Conference,London.London:Thomas Telford;1997.p.492-501.
Morris SS,Garrett WS.The raising and strengthening of Steenbras Dam.Proceedings of the Institution of Civil Engineers,Part 1 1956;5(1):23-48.
Panton B,Elmo D,Schotfeldt P,Carvalho J.Design of rock foundation anchorage using Discrete Fracture Networks.In:Proceedings of the International Discrete Fracture Network Engineering Conference,Vancouver;2014.
Park J,Qiu T,Kim Y.Field and laboratory investigation of pullout resistance of steel anchors in rock.Journal of Geotechnical and Geoenvironmental Engineering,ASCE 2013;139(12):2219-24.
Pease KA,Kulhawy FH.Load transfer mechanisms in rock sockets and anchors.Report EL-3777.Palo Alto:Electric Power Research Institute;1984.
Powell CN,Shaffner PT,Wright J.Exploration and geotechnical characterization for evaluating the stability of Hungry Horse Dam.In:The sustainability of experience-investing in the human factor,Proceedings of the 28th Annual USSD Conference,Portland.Denver:US Society on Dams;2008.p.115-33.
Phoon KK,Kulhawy FH,Grigoriu MD.Development of a reliability-based design framework for transmission line structure foundations.Journal of Geotechnical and Geoenvironmental Engineering,ASCE 2003;129(9):798-806.
Regenass P,Soubra AH.Limit loads of strip anchors.In:Littlejohn GS,editor.Ground anchorages and anchored structures:Proceedings of the International Conference,London.London:Thomas Telford;1997.p.109-18.
Ren FF,Yang ZJ,Chen JF,Chen WW.An analytical analysis of the full-range behaviour of grouted rockbolts based on tri-linear bond-slip.Construction and Building Materials 2010;24(3):361-70.
Scott GA,Bruce DA.Full scale field tests of high capacity rock anchors.In:Tillerson JR,Wawersik WR,editors.Proceedings of the 33rd US Symposium on Rock Mechanics,Santa Fe.Rotterdam:A.A.Balkema;1992.p.471-80.
Scott GA,Mills-Bria BL.Nonlinear,3D,dynamic coupled dam-foundation analyses for estimating risks at Hungry Horse Dam.In:The sustainability of experienceinvesting in the human factor,Proceedings of the 28th Annual USSD Conference,Portland.Denver:US Society on Dams;2008.p.135-50.
Serrano A,Olalla C.Tensile resistance of rock anchors.International Journal of Rock Mechanics and Mining Sciences 1999;36(4):449-74.
Shaffner P,Heisler R,Krosley L,Kottenstette J,Wright J.Characterization of dam foundation blocks using digital photogrammetric mapping and borehole geophysical logging to create comprehensive 3D foundation models.In:Managing our water retention systems,Proceedings of the 29th Annual USSD Conference,Nashville.Denver:US Society on Dams;2009.p.473-505.
She CX.Deformation and stability of the right arch dam abutment of the Danjiang hydro-power project,China.International Journal of Rock Mechanics and Mining Sciences 2004;41(Suppl.1):792-7.Paper 3B 04,ISRM SinoRock 2004 Symposium(on CD-ROM).
Singhal AC,Nuss LK.Cable anchoring of deteriorated arch dam.Journal of the Performance of Constructed Facilities,ASCE 1991;5(1):19-36.
Sloan SW.Upper bound limit analysis using finite elements and linear programming.International Journal for Numerical and Analytical Methods in Geomechanics 1989;13(3):263-82.
Sloan SW.Geotechnical stability analysis.Géotechnique 2013;63(7):531-72.
Snape D.Sustainable rehabilitation of gravity dams using post-tensioned anchors.ANCOLD Bulletin No 120.April 2002.p.47-56.
Soubra AH,Regenass P.Overall stability of anchored sheet pile structures.In:Littlejohn GS,editor.Ground anchorages and anchored structures:Proceedings of the International Conference,London.London:Thomas Telford;1997.p.100-8.
Thomas-Lepine C.Rock bolts-improved design and possibilities.MSc Thesis.Trondheim:Norwegian University of Science and Technology;2012.
Topham C,Nicholson E,Tanner D.Managing risk of under-designed spillway training walls:an owner’s guide.In:McSaveney ER,editor.Multiple use of dams and reservoirs:needs,bene fits and risks,Proceedings of the NZSOLD-ANCOLD 2013 Conference,Rotorua,39(1(LD)).Wellington:IPENZ Proceedings of Technical Groups;2013.p.384-98.
USACE.Gravity dam design.Engineer Manual EM1110-2-2200.U.S.Army Corps of Engineers;1995.
USACE.Stability analysis of concrete structures.Engineer Manual EM1110-2-2100.U.S.Army Corps of Engineers;2005.
Wang D,Merifield RS,Gaudin C.Uplift behaviour of helical anchors in clay.Canadian Geotechnical Journal 2013;50(6):575-84.
Weerasinghe RB,Adams D.A technical review of rock anchorage practice 1976-1996.In:Littlejohn GS,editor.Ground anchorages and anchored structures:Proceedings of the International Conference,London.London:Thomas Telford;1997.p.481-91.
Weerasinghe RB,Littlejohn GS.Uplift capacity of shallow anchorages in weak mudstone.In:Littlejohn GS,editor.Ground anchorages and anchored structures:Proceedings of the International Conference,London.London:Thomas Telford;1997.p.23-33.
Westberg Wilde M,Johansson F.System reliability of concrete dams with respect to foundation stability:application to a spillway.Journal of Geotechnical and Geoenvironmental Engineering,ASCE 2013;139(2):308-19.
Wilkins JK,Fidler BE.Design of Catagunya prestressed dam.Civil Engineering Transactions,Institution of Engineers,Australia 1959;CE1:47-63.
Wolfhope J,Bruce D,Forbes G,Boyd L.Post-tensioned rehabilitation applied to hydropower dams.In:Littlejohn GS,editor.Ground anchorages and anchored structures in service,Proceedings of the International Conference,London.London:Thomas Telford;2007.p.132-43.
Woods RI,Barkhordari K.The influence of bond stress distribution on ground anchor design.In:Littlejohn GS,editor.Ground anchorages and anchored structures:Proceedings of the International Conference,London.London:Thomas Telford;1997.p.55-64.
Wyllie DC.Foundations on rock:engineering practice.2nd ed.London:E&FN Spon;1999.
Xanthakos PP.Ground anchors and anchored structures.New York:John Wiley;1991.
Xu H,Benmokrane B.Strengthening of existing concrete dams using post-tensioned anchors:a state-of-the-art review.Canadian Journal of Civil Engineering 1996;23(6):1151-71.
Yu X,Zhou YF,Peng SZ.Stability analyses of dam abutments by 3D elasto-plastic finite-element method:a case study of Houhe gravity-arch dam in China.International Journal of Rock Mechanics and Mining Sciences 2005;42(3):415-30.
Zhao YM,Yang MJ.Pull-out behaviour of an imperfectly bonded anchor system.International Journal of Rock Mechanics and Mining Sciences 2011;48(3):469-75.
Zicko KE,Bruce DA,Kline RA.The stabilization of Gilboa Dam,New York,using high capacity rock anchors:addressing service performance issues.In:Littlejohn GS,editor.Ground anchorages and anchored structures in service,Proceedings of the International Conference,London.London:Thomas Telford;2007.p.153-65.
Zou DHS.Analysis of in situ rock bolt loading status.International Journal of Rock Mechanics and Mining Sciences 2004;41(Suppl.1):762-7.
Journal of Rock Mechanics and Geotechnical Engineering2015年1期