刘海苹 杨扬 丁琳 张泽
摘要:为保障大兴安岭多年冻土区道路工程安全运营,从众多影响因素中选择冻土环境、自然环境和工程措施等建立评价集,确定评价指标的等级标准。运用模糊数学的隶属度理论,建立多年冻土区路基模糊综合评价模型。依据大兴安岭地区中俄原油管道漠大线林区伴行路典型路段监测数据,对模型评价结果进行验证分析。结果表明,模型评价结果与实际道路路基病害一致性较高,该评价方法可应用于冻土路基热稳定性评价,具有一定的实用性。
关键词:大兴安岭;多年冻土;路基稳定性;评价指标;模糊综合评价
中图分类号:U416.1文献标识码:A文章编号:1006-8023(2023)02-0176-08
Fuzzy Comprehensive Evaluation of Subgrade Stability
in Daxing'an Mountains Permafrost Area
LIU Haiping1, YANG Yang1*, DING Lin2, ZHANG Ze3
(1.College of Civil and Architectural Engineering, Heilongjiang Institute of Technology, Harbin 150050, China;
2.School of Civil Engineering, Heilongjiang University, Harbin 150080, China; 3. School of
Civil Engineering, Northeast Forestry University, Harbin 150040, China)
Abstract:In order to ensure the safe operation of road engineering in the Daxing'an Mountains permafrost area, this paper selected the permafrost environment, natural environment and engineering measures from a large number of influencing factors to establish an evaluation set and determine the grade standard of evaluation indexes. Based on the membership degree theory of fuzzy mathematics, a fuzzy comprehensive evaluation model of subgrade in permafrost area was established. Based on the monitoring data of the typical subgrade of the accompanying road in the permafrost area of the Mohe-Daqing line of China Russia crude oil pipeline in Daxing'an Mountains area, the results of the evaluation model were verified and analyzed. The results showed that the model evaluation results were highly consistent with the actual road subgrade diseases. The evaluation method can be applied to the thermal stability evaluation of frozen soil subgrade, and has certain practicality.
Keywords:Daxing'an Mountains; permafrost; subgrade stability; evaluation index; fuzzy comprehensive evaluation
收稿日期:2022-07-07
基金项目:黑龙江省省属本科高校基本科研业务费项目(博士基金)(2020BJ01);黑龙江省自然科学基金项目(LH2019E078)
第一作者简介:刘海苹,博士,副教授。研究方向为道路工程、冻土工程。Email: liuhaiping0451@126.com
*通信作者:杨扬,博士,副教授。研究方向为道路工程、冻土工程。Email: yangyang1975197@163.com
引文格式:刘海苹,杨扬,丁琳,等.大兴安岭多年冻土区路基稳定性模糊综合评价[J].森林工程,2023(2):176-183.
LIU H P, YANG Y, DING L, et al. Fuzzy comprehensive evaluation of subgrade stability in Daxing'an Mountains permafrost area[J]. Forest Engineering, 2023(2):176-183.
0引言
多年凍土区路基的全寿命服役演化问题被视为一个世界性难题。多年冻土区道路的修筑改变了大气和地表的热交换条件[1-3],打破了路基下原有的水热平衡状态,引起路基下部多年冻土水热状况、冻融过程以及多年冻土上限的变化[4-5],导致路基冻胀、融沉和翻浆等病害尤为突出[6-8]。因此,为保障多年冻土区道路工程安全运营,有效评价多年冻土路基稳定性显得尤为重要[9]。
影响路基稳定性评价是相对复杂的、不确定的、模糊的系统工程[10-11]。目前,模糊数学理论在道路运营综合评价中得到广泛的应用。模糊综合评判方法可以顾及对象的层次性,体现评价标准、影响因素的模糊性,又可以扩大信息量,发挥人的经验,使评价结果更客观。李祝龙等[12]应用模糊综合判断原理,对多因素影响的融沉进行分析探讨,判断最终沉降量以进行预报和控制。张永杰等[13]建立了岩溶路基稳定性二级模糊综合评判模型,进行了岩溶区公路路基稳定性的区间模糊评判分析。毛卫南等[14]运用模糊数学理论,提出了多年冻土区输油管道服役性能的评价模型,对其服役性能的可靠度进行了评价。曹伟等[15]以青海柴木铁路为例,采用模糊数学方法对柴木铁路多年冻土区片石路基工程措施效果进行评价。程培峰等[16]利用模糊综合评判法建立评价模型,进行了季冻区公路路基使用状况进行评价。刘华等[17]对寒区高速铁路路基稳定性问题的多因素量化评价,应用模糊数学理论提出了寒区高铁路基稳定性模糊综合评判方法。
大兴安岭多年冻土位于欧亚大陆多年冻土区的南部边缘地带,受纬度地带性制约和海拔影响的叠加,大兴安岭多年冻土具有独特的水热特性[18-19]。目前,针对大兴安岭地区高纬度多年冻土公路路基稳定性评价开展较少。因此,本研究以大兴安岭地区中俄原油管道漠大线林区伴行路为依托工程,从众多因素中选择冻土环境、自然环境和工程措施等因素,建立模糊综合评价模型对大兴安岭多年冻土区路基穩定性进行评价,为高纬度多年冻土地区道路运营期间的养护决策及安全运营提供依据。
1多年冻土区路基稳定性评价指标体系
1.1评价指标
影响多年冻土路基稳定性的影响因素很多,且各因素之间关联复杂,本研究以冻土环境、自然环境和工程措施3个方面为主要考虑因素,将模糊层次结构体系按从高到低的顺序分成:目标层——多年冻土路基稳定性;准则层——冻土环境、自然环境和工程措施;指标层——若干具体指标,具体如图1所示。
1.2评价指标的等级标准
根据相关文献[20-21]和工程经验,并结合现场的调查和研究,将多年冻土区路基稳定性分为4个等级,见表1。
2多级模糊综合评价模型
模糊综合评价模型由3个要素U、V、R构成,U=u1,u2,…,un为n中因素(或指标),V=v1,v2,…,vn为m种评价。综合评价(B)是V上的一个模糊子集,见式(1),其依赖于各因素的权重,权重(A)是U上的模糊子集[22-24],见式(2)
B=(b1,b2,…,bm)∈F(V)。 (1)
A=(a1,a2,…,an)∈F(U)。 (2)
式中:bi为某单元隶属于第i评价等级的程度;m=4;ai为各指标的权重;n为评价指标数。
对每一个因素ui,单独做一个评价f(ui),这可以看作是从U到V的模糊映射f,由f可导出U到V的一个模糊关系矩阵R,见式(3)。
R=(rij)m×n=r11r12…r1nr21r22…r2n…rm1rm2…rmn 。(3)
式中,ri1-rij为计算的隶属度。
确定定量指标隶属度函数,可采用升降半梯形函数和线性三角函数,见式(4)—式(7)[25]
ri1=1x≤C1或x≥C1
C2-xC2-C1或x-C2C1-C2C1≤x≤C2或C1≥x≥C2
0x≤C2或x≥C2 。(4)
ri2=x-C1C2-C1或C1-xC1-C2C1
C3-xC3-C2或x-C3C2-C3C2
0x≤C1或x≥C2或(x≥C1或x≤C2) 。(5)
ri3=x-C2C3-C2或C2-xC2-C3C2
C4-xC4-C3或x-C4C3-C4C3
0 (x≤C2或x≥C4)或(x≥C2或x≤C4) 。 (6)
ri4=1 x≤C3或x≥C3
x-C3C4-C3或C3-xC3-C4C3≤x≤C4或C3≥x≥C40 x≤C4或x≥C4 。(7)
式中:x为实际值;C1—C4与相应的分级标准,取各等级标准范围值的中位数。
2.1单层次模糊综合评价
由于评价因素的复杂性,在多年冻土路基工程稳定性部分评价指标只能定性描述[26]。表2给出了理想条件下评价状态的隶属度分布结果,但在实际计算中,有时分布各级状态的隶属度差异不是太大,实际中常按照最大隶属度原则划定所属状态。
通过建立单因素评价R和权重A,即得到某一单元的综合评价结果,见式(8)
B=A·R=(a1,a2,…,an)·r11r12…r1nr21r22…r2n…rm1rm2…rmn。(8)
2.2多层次模糊综合评价
对于复杂的系统来说,需要考虑较多的因素及因素之间的层次,若采用单层次模糊综合评价很难得出较为可靠的评价结果。这就需要将某一个系统按某种属性划分为m个子系统,先按照单层次模糊综合评价模型进行评价,评价结果为m个B=b1,b2,…,bm。然后将m个评价结果B1,B2,…,Bm组成新的评价决策矩阵R~,见式(9)
R~=B1B2B3=b11b12…b1nb21b22…b2n…bm1bm2…bmn。(9)
如果m个评价子系统的权重集为A~,则可以得到综合评价结果B~=A~·R~。
3权重确定
权重是反映模糊综合评价中各个因素的相对重要程度,具有非常重要的作用。本研究中的权重使用的是专家调查法,对多位专家给出的相关因素的权重进行整理和统计分析,集合专家的意见确定了各因素、各指标的权重。采用的评价一级指标权重见表3,评价二级指标权重如图2所示。
4多年冻土区典型地段路基稳定性综合评价计算
选取中俄原油管道漠大线林区伴行路沿线5个主要典型路段(松岭区至古源镇、新天林場至太阳沟、塔源至林海、塔尔根至塔河、绣峰林场至瓦拉干镇)进行多年冻土路基稳定性综合评价计算,以松岭区至古源镇路段的评价来说明整个评价过程,各路段参与评价指标数据见表4。
4.1建立因素集
由图1可知,评价因素为u,各个单因素子集分别为:U1=u11,u12,u13,U2=u21,u22,u23,u24,U3=u31,u32。
4.2评价集
评价等级分为良好、较好、一般、较差4个等级,即V=v1,v2,v3,v4=1.0,0.8,0.6,0.4。
4.3构建综合评价决策矩阵
对于冻土环境子因素冻土类型来说,根据多年冻土的监测资料和调查数据,松岭区至古源镇冻土类型为多冰-富冰冻土,按照表1中的评价分级标准,评级等级为一般。根据表2中的隶属度值,可得到冻土类型评价集:r1=r11,r12,r13,r14,=0.0,0.1,0.8,0.1。对于子因素年平均地温,松岭区至古源镇年平均地温为高于-1.2 ℃,按表1中的评价分级标准可知,C1=-3,C2=-2.25,C3=-1,C4=3。采用式(4)—式(7)及表4数据,可定量计算得到r2=r21,r22,r23,r24,=0.0,0.2,0.8,0.0;对于子因素天然冻土上限评价集,同理计算可得r3=r31,r32,r33,r34,=0.0,0.3,0.7,0.0。
因此,冻土环境评价决策矩阵为
R1=0.00.10.80.10.00.20.80.00.00.30.70.0。
同理计算自然环境和工程措施子因素的评价决策矩阵R2、R3。由表3、图2可确定权重A~、A1、A2、A3,通过矩阵乘法计算得到各子集的综合评价结果
B1=A1·R1=0.000,0.166,0.782,0.052。
B2=A2·R2=0.015,0.288,0.455,0.242。
B3=A3·R3=0.450,0.415,0.485,0.055。
因此,各个子集的综合评价决策矩阵为
R~=B1B2B3=0.0000.1660.7820.0520.0150.2880.4550.2420.4500.4150.4850.055。
4.4模糊综合评价计算
松岭区至古源镇路段路基稳定性模糊综合评价计算结果为
B~=A~·R~=0.014 7,0.258 6,0.618 9,0.107 8。
同理可对新天林场至太阳沟、塔源至林海、翠岗镇至富乐、绣峰林场至瓦拉干镇路段路基稳定性模糊进行评价计算。
4.5评价结果验证
4.5.1试验断面监测情况
冻土路基内部温度的分布变化是影响冻土路基稳定性的重要因素[27]。本研究对典型路段(松岭区至古源镇、新天林场至太阳沟、塔源至林海、塔尔根至塔河、绣峰林场至瓦拉干镇)分别选取了5个典型试验断面进行监测,监测断面地温等值线如图3所示。由图3(a)可知,10月末到次年3月在季节活动层与上限之间,明显存在一个不可冻结的融化夹层,整个路基下部多年冻土温度明显持续升高,多年冻土路基热稳定性较差。由图3(b)可知,11月中旬到次年2月间形成了一个不能冻结的融化夹层,但由于多年冻土地温较低,有足够的冷能使融化夹层在年内冻结,人为上限逐渐稳定于路基下最大冻结深度处,路基底部多年冻土属于衔接状态。图3(c)与图3(b)断面相比,该断面的地温更低,因此该断面本身含有的冷量更多、更稳定。由图3(d)可知,10月到次年1月间形成了一个不能冻结的融化夹层,稳定性好于图3(a)。由图3(e)可知,该路段为低温冻土区,土体内本身的冷量较多,稳定性相对较好。
4.5.2模型评价结果
使用加权平均求隶属等级的方法,其中量化评价等级标准VT=1.0,0.8,0.6,0.4T,对各路段等级位置进行排序。各路段评价值如下
0.014 70.258 60.618 90.107 80.314 80.262 20.356 00.068 00.306 30.409 90.251 10.032 70.155 60.393 40.317 60.133 40.154 10.356 40.440 30.049 2·
1.00.80.60.4=0.636 00.765 40.798 00.714 20.723 1。
由计算结果可知,典型路段的多年冻土路基稳定性评价等级除松岭区至古源镇路段评价值0.636 0为较差等级外,其他路段主要集中在一般等级。因此,可以看出模型评价结果与试验断面监测结果相吻合。
5结论
1)以冻土环境、自然环境和工程措施3个方面为主要考虑因素,建立了冻土路基稳定性评价的二级模糊综合评价模型,构建了综合评价决策矩阵。
2)选取大兴安岭多年冻土区5个典型路段进行路基稳定性模糊综合评价,得到了路基稳定性评价等级主要集中在一般等级,评价结果与实际道路路基病害一致性较高,表明此方法可对大兴安岭地区多年冻土路基的稳定性进行评价。
3)影响多年冻土路基稳定性的影响因素很多,且各因素之间关联复杂。因此,评价指标的选取直接着影响着评价结果,上述评价指标尚有待进一步探索和完善。
【参考文献】
[1]YU W B, YI X, NIU Y Z, et al. Dynamic thermal regime of permafrost beneath embankment of Qinghai-Tibet Highway under the scenarios of changing structure and climate warming[J]. Cold Regions Science and Technology, 2016, 126: 76-81.
[2]金會军,于少鹏,吕兰芝,等.大小兴安岭多年冻土退化及其趋势初步评估[J].冰川冻土,2006,28(4):467-476.
JIN H J, YU S P, LYU L Z, et al. Degradation of permafrost in the Da and Xiao Hinggan Mountains, northeast China, and preliminary assessment of its trend[J]. Journal of Glaciology and Geocryology, 2006, 28(4): 467-476.
[3]LIU H P, DING L, YANG Y, et al. Evolution of the temperature field of the subgrade in the permafrost regions of the Great Khingan mountains[J]. Journal of Testing and Evaluation, 2018, 46(6): 2319-2329.
[4]ZHANG Z Q, WU Q B, LIU Y Z, et al. Thermal accumulation mechanism of asphalt pavement in permafrost regions of the Qinghai-Tibet Plateau[J]. Applied Thermal Engineering: Design, Processes, Equipment, Economics, 2018, 129: 345-353.
[5]龚强,晁华,朱玲,等.东北地区地温和冻结深度时空特征的细化分析[J].冰川冻土,2021,43(6):1782-1793.
GONG Q, CHAO H, ZHU L, et al. Detailed analysis of spatial and temporal characteristics of ground temperature and frost depth in Northeast China[J]. Journal of Glaciology and Geocryology, 2021, 43(6): 1782-1793.
[6]牛富俊,马巍,吴青柏.青藏铁路主要冻土路基工程热稳定性及主要冻融灾害[J].地球科学与环境学报,2011,33(2):196-206.
NIU F J, MA W, WU Q B. Thermal stability of roadbeds of the Qinghai-Tibet railway in permafrost regions and the main freezing-thawing hazards[J]. Journal of Earth Sciences and Environment, 2011, 33(2): 196-206.
[7]HUANG C F, LI Q, WU S C, et al. Subgrade stability evaluation in permafrost regions based on unascertained measurement model[J]. Geotechnical and Geological Engineering, 2019, 37(2): 707-719.
[8]刘海苹,杨扬,武鹤,等.高纬度多年冻土区路面类型对路基热稳定性影响分析[J].交通科技与经济,2020,22(1):49-53.
LIU H P, YANG Y, WU H, et al. Influence analysis of pavement types on thermal stability of subgrade in high-latitude permafrost area[J]. Technology & Economy in Areas of Communications, 2020, 22(1): 49-53.
[9]REGEHR J D, MILLIGAN C A, MONTUFAR J, et al. Review of effectiveness and costs of strategies to improve roadbed stability in permafrost regions[J]. Journal of Cold Regions Engineering, 2013, 27(3): 109-131.
[10]马立峰,刘建坤,牛富俊.基于可靠度的多年冻土区路基稳定性评价及应用分析[J].工程地质学报,2009,17(4):522-527.
MA L F, LIU J K, NIU F J. Reliability based AHP-fuzzy synthetic evaluation system for stability of roadbeds in permafrost regions[J]. Journal of Engineering Geology, 2009, 17(4): 522-527.
[11]SHEN Y Y, CHEN D X, ZHANG M, et al. Fuzzy comprehensive safety evaluation of pipeline disaster in China-Russia crude oil permafrost region based on improved analytic hierarchy process-entropy weight method[J]. Advances in Materials Science and Engineering, 2022, 2022: 1-10.
[12]李祝龙,章金钊.青藏公路冻土路基沉降的模糊综合评判[J].公路,2000,45(2):21-24.
LI Z L, ZHANG J Z. Fuzzy comprehensive evaluation of frozen soil subgrade settlement of Qinghai-Tibet highway[J]. Highway, 2000, 45(2): 21-24.
[13]张永杰,曹文贵,赵明华,等.岩溶区公路路基稳定性的区间模糊评判分析方法[J].岩土工程学报,2011,33(1):38-44.
ZHANG Y J, CAO W G, ZHAO M H, et al. Interval fuzzy judgment method for roadbed stability in Karst area[J]. Chinese Journal of Geotechnical Engineering, 2011, 33(1): 38-44.
[14]毛卫南,田泽野,刘建坤.冻土区输油管道服役性能可靠度评价[J].地下空间与工程学报,2013,9(S1):1526-1530.
MAO W N, TIAN Z Y, LIU J K. Evaluation of the reliability of oil pipeline serving performance in permafrost region[J]. Chinese Journal of Underground Space and Engineering, 2013, 9(S1): 1526-1530.
[15]曹伟,陈继,张波,等.青海柴木铁路多年冻土区片石路基工程措施效果的模糊评价[J].冰川冻土,2015,37(6):1555-1562.
CAO W, CHEN J, ZHANG B, et al. Fuzzy evaluation of the effect of rubble roadbed engineering in permafrost regions along the Chaidaer-Muli Railway in Qinghai Province[J]. Journal of Glaciology and Geocryology, 2015, 37(6): 1555-1562.
[16]程培峰,姚志英,陳景龙.季冻区公路路基使用状况评定系统的研究[J].公路工程,2015,40(5):14-17,26.
CHENG P F, YAO Z Y, CHEN J L. Research on service condition evaluation system of highway subgrade in season frozen area[J]. Highway Engineering, 2015, 40(5): 14-17, 26.
[17]刘华,牛富俊,牛永红,等.基于模糊数学的寒区高速铁路路基稳定性评价及应用分析[J].西安建筑科技大学学报(自然科学版),2014,46(3):367-375.
LIU H, NIU F J, NIU Y H, et al. Comprehensive evaluation on stability of roadbed of high-speed railway in seasonal frozen regions based on fuzzy mathematic[J]. Journal of Xi'an University of Architecture & Technology (Natural Science Edition), 2014, 46(3): 367-375.
[18]JIN H J, YU Q H, LYU L Z, et al. Degradation of permafrost in the Xing'anling mountains, northeastern China[J]. Permafrost and Periglacial Processes, 2007, 18(3): 245-258.
[19]杨永鹏,程东幸,伏慧霞.东北大兴安岭多年冻土区工程地质特征及评价[J].工程地质学报,2008,16(5):657-662.
YANG Y P, CHENG D X, FU H X. Engineering geological characteristics and evaluations of permafrost in Daxing'an Mountains[J]. Journal of Engineering Geology, 2008, 16(5): 657-662.
[20]孟进宝,杨永鹏,韩龙武,等.基于模糊理论的青藏铁路冻土路基安全性评价[J].铁道建筑,2015,55(8):88-92.
MENG J B, YANG Y P, HAN L W, et al. Safety evaluation on permafrost subgrade of Qinghai-Tibet railway based on fuzzy theory[J]. Railway Engineering, 2015, 55(8): 88-92.
[21]严学斌.青藏铁路五道梁冻土路基稳定性评价方法研究[D].北京:北京交通大学,2013.
YAN X B. Study on subgrade stability evaluation method in Wudaoliang permafrost region of Qinghai-Tibet railway[D]. Beijing: Beijing Jiaotong University, 2013.
[22]谢俊元,须文波.基于模糊综合评判理论的载人深潜器操纵技巧评价方法[J].船舶力学,2007,11(5):708-715.
XIE J Y, XU W B. An evaluation method of the navigation and working skill for HOV based on the theory of fuzzy synthetic evaluation[J]. Journal of Ship Mechanics, 2007, 11(5): 708-715.
[23]马可锦,郭松,林海.基于组态效应的高峰森林公园使用后评价研究[J].西部林业科学,2022,51(6):24-30.
MA K J, GUO S, LIN H. Post occupancy evaluation of Gaofeng forest park based on configuration effect[J]. Journal of West China Forestry Science, 2022, 51(6): 24-30.
[24]海洋,苗群,和慧,等.模糊综合评价在水环境质量评价中的应用[J].青岛理工大学学报,2007,28(6):68-72.
HAI Y, MIAO Q, HE H, et al. Application of fuzzy comprehensive evaluation to water quality evaluation[J]. Journal of Qingdao Technological University, 2007, 28(6): 68-72.
[25]謝艳丽,包正红,蒋玲,等.模糊数学综合评价法在多年冻土区塔基稳定性评价中的应用[J].青海电力,2019,38(4):39-42.
XIE Y L, BAO Z H, JIANG L, et al. Application of fuzzy mathematics comprehensive evaluation method to stability evaluation of tower foundation in permafrost regions[J]. Qinghai Electric Power, 2019, 38(4): 39-42.
[26]郑东凯.基于ArcGIS的青藏走廊带多年冻土路基稳定性评价研究[D].西安:长安大学,2013.
ZHENG D K. Evaluation of the subgrade stability in permafrost region of Qinghai-Tibet corridors based on ArcGIS[D]. Xi'an: Chang'an University, 2013.
[27]杨扬,刘海苹,丁琳,等.多年冻土区典型公路病害类型及形成机理研究[J].交通科技与经济,2017,19(1):46-48,53.
YANG Y, LIU H P, DING L, et al. On the types and formation mechanism of highway diseases in permafrost regions in Heilongjiang Province[J]. Technology & Economy in Areas of Communications, 2017, 19(1): 46-48, 53.