Experimental Study on Cloud-Computing-Based Electric Power SCADA System

2015-10-11 06:11YongboChenJijunChenandJiafengGan
ZTE Communications 2015年3期

Yongbo Chen,Jijun Chen,and Jiafeng Gan

(1.ZTE Corporation,Nanjing 210012,China;2.Dongfang Electronics Co.,Ltd.,Yantai 264000,China)

Experimental Study on Cloud-Computing-Based Electric Power SCADA System

Yongbo Chen1,Jijun Chen1,and Jiafeng Gan2

(1.ZTE Corporation,Nanjing 210012,China;2.Dongfang Electronics Co.,Ltd.,Yantai 264000,China)

With the development of smart grid,the electric power supervisory control and data acquisition(SCADA)system is limited by the traditional IT infrastructure,leading to low resource utilization and poor scalability.Information islands are formed due to poor system interoperability.The development of innovative applications is limited,and the launching period of new businesses is long. Management costs and risks increase,and equipment utilization declines.To address these issues,a professional private cloud solution is introduced to integrate the electric power SCADA system,and conduct experimental study of its applicability,reliability,security,and real time.The experimental results show that the professional private cloud solution is technical and commercial feasible,meeting the requirements of the electric power SCADA system.

smart grid;cloud computing;electric power SCADA;professional private cloud;virtualization;cloud storage;real-time industrial control

1 Introduction

A n electric power system typically involves generation,transmission,transformation,distribution,consumption,and dispatching processes.Electric power is generated and consumed simultaneously,and is not available for mass storage or transportation.Thus,as the key to the electric power system,monitoring and dispatching guarantee the reliability and security of electric power generation,transmission,distribution,and consumption,and play a key role in providing high-quality and economic electric power.An electric power dispatching and monitoring system is often called a supervisory control and data acquisition(SCADA)system,energy management system(EMS),or distribution management system(DMS)globally.In this article,we call it the electric power SCADA system.

Monitoring and dispatching of the electric power system relied on simple automatic devices,phones,and operation personnel from the very beginning,then on computers in the 1960s.With the popularity of high-performance micro-computers in the 1970s,more power monitoring and dispatching functions became available,and gradually developed into the electric power SCADA system.In the early stage,the electric power SCADA system mainly used a multi-computer architecture,consisting of single-server and two-server cluster systems.Currently,the system uses computer systems with a distributed open architecture[1]-[3].The electric power SCADA system provides SCADA,automatic generation control(AGC),automatic voltage control(AVC),EMS,DMS,dispatcher training system(DTS),geographic information system(GIS),and other useful functions[3].The software application system is constructed and developed by using the standard CIM model,and software architecture has evolved from the Client/Server architecture to the current Browser/Server architecture.The newgeneration Smart Grid dispatching and control system uses multi-core computer cluster technology to improve system reliability and processing capacity,and uses a service-oriented architecture(SOA)to enhance system interoperability and achieve"horizontal integration and vertical interconnection"[4]of power grid dispatching services.

Hardware infrastructure of these application systems involves high-performance servers,complex high-speed computer networks,high-performance and highly reliable data storage systems,and workstations.The SCADA software is developed based on the platform which consists of Windows,UNIX,and Linux operating systems,and is based on relational databases. The whole system is connected through computer networks for data exchange and sharing,and application programs share information through an enterprise service bus(ESB).With the development of the traditional IT application systems,IT-based applications have been expanding deeply to another industry field,and encountered various problems and bottlenecks.Thesame is true for the electric power SCADA system,which is a professional IT application system.Especially with the advancement of Smart Grid,the future electric power dispatching center should have high computing capacity,and powerful information acquisition,integration,and analysis functions.Existing centralized computing platforms of electric power systems can hardly meet the above requirements,which has become one of the major bottlenecks in the Smart Grid[5].

The major disadvantages are as follows:

1)Low basic resource utilization and poor scalability.A large amount of basic computing resources to meet the demands in peak hours are idle during off-peak hours.To ensure reliability,lots of resources are redundant,and cannot be fully utilized.Contradictions are growing between energy demands and conservation policies.Due to the upgrade of business,the existing IT infrastructure cannot be reused. Currently,analysis and computing in the electric power system rely on the centralized computing platform in the dispatching center.Due to limited computing capacity,poor scalability,and high upgrade costs,large-scale power systems suffer from insufficient data storage and analysis capabilities[5].

2)Poor system interoperability leading to information islands. Parallel application systems have their own architectural features,and therefore resources cannot be exchanged or reused,further hampering in-depth information and business integration.Due to parallel information island applications,computing resources cannot be shared,limiting the application of distributed computing,cloud storage,and big data.

3)Limited development of innovative applications,and long launch period of new business.Traditional business applications should go through a long period of design,project initiation,bidding,and procurement before they are launched,failing to meet the requirements of rapid business expansion.Compatibility with existing systems is achieved at the expense of functions,quality,and time.With the emergence of Smart Grid,Internet of Things(IoT),mobile Internet,and big data technologies,the existing architecture and technology can hardly meet the demands for new business development and application.With the development of Smart Grid construction,big data has been regarded as an important support for Smart Grid.Most of the current power data analysis systems are based on relational databases,with low analysis speed and poor scalability.Therefore,they can hardly meet the demands for big data storage and analysis in the era of Smart Grid,which has become a bottleneck for Smart Grid construction[6].

4)Increasing management costs and risks,and decreasing equipment utilization.For example,the installed capacity of data centers grows,rapidly increasing management and maintenance complexity.Management costs and energy consumption are increased.System reliability is lowered,while operational risks are increased. Upgrade costs are also increased.

Fig.1 shows the relations between IT resources based on the statistical data of the Dongfang Electronics DF8000 dispatching master system in projects at different scales.Fig.1 involves the number of services,storage space,energy consumption,availability,and operational costs.

2 Cloud Computing Technology and Its Application in Electric Power Industry

2.1 Overview of Cloud Computing Technology

Since people proposed the Cloud Computing concept,cloud computing has been fully discussed and studied,and applied and developed in various scenarios in the past ten years.The major features of cloud computing are described in[7],including:1)Use on demand;2)Ubiquitous access;3)Multiple users and resource pools;4)Flexibility;5)Measurement;6)Redundancy.

Thanks to these features,cloud computing can be used to solve various problems occurred during application deployment,use,and innovation process of the electric power SCADA system.

The current cloud computing applications include public cloud,private cloud,and hybrid cloud,which are suitable for different application scenarios.A private cloud has advantages in application autonomy and security.However,the electric power SCADA system and other real-time industrial control systems have strong requirements for adaptability,reliability,security,and real time.A private cloud is applicable to common business scenarios,including office automation,enterprise resource planning(ERP),finance,and HR management,but is not suitable for specialized applications of industrial production.Therefore,a private cloud needs to be further improved.In this paper,we propose to use the professional private cloud solution to solve these problems.Professional private clouds are deployed in professional production control areas,which are logically or even physically isolated from noncontrol areas,to meet the strong requirements for adaptability,reliability,security,and real time.

▲Figure 1.Relational graph of number of servers,storage space,energy consumption,availability,and operational costs.

2.2 Application of Cloud Computing in Electric Power Industry

In accordance with the Power Monitoring System Security Regulations(National Development and Reform Commission of the People′s Republic of China<No.14>),the field of electric power production and operations management is divided into production control areas and management information areas;and production control areas are further divided into control zones(Safety Zone I)and non-control zones(Safety ZoneⅡ). The cloud computing technology has numerous practical applications in management information areas.The application scenarios include customer service,electric power marketing,video surveillance,collaborative office,and ERP;and the application areas include offices,maintenance companies,power plants,training schools,and business offices.The research of Zhejiang Provincial Electric Power Company(ZPEPC)on the application of enterprise management IT infrastructure in resource pool virtualization as well as related application results are described in[8].The author describes the research and experimentation of Henan Electric Power Company on cloud computing-based data center platforms of power grid enterprises in[9].The pilot construction and application results of cloud desktop technologies in State Grid Corporation of China are described in[10].These applications of cloud computing technology in management information areas have greatly enhanced IT resource utilization and operation and maintenance efficiency of electric power enterprises,and achieved good economic and social benefits through exploration and practice of cloud computing application in the electric power industry.

Discussion and research of cloud computing technology are also conducted in production control areas.Because of the extreme importance of the electric power system to social and economic production and life,research and practice of cloud computing carried out in production control areas of the power system are conservative,with few research results and application cases.

The bottlenecks and limitations of traditional electric power dispatching systems are discussed in[5].The author also describes the major features of cloud computing,and elaborates on the implementation of cloud computing platforms in electric power systems by focusing on physical components,system architecture,and software technology.

The advantages of cloud computing models,assesses potential risks are discussed in[11],the availability of popular cloud computing technologies in the electric power SCADA system are analyzed,and whether cloud computing models can be used in the electric power SCADA system are thoroughly explored.This article finally outlines an application architecture of cloud computing models in the electric power SCADA system based on four layers(including the infrastructure layer,resource management layer,cloud service layer,and application layer)and six applications(including models,data,searching,planning,calculation,and mutual backup).

The application of cloud computing in the Smart Grid dispatching system is studied in[12],and a task scheduling algorithm based on improved genetic algorithms are proposed in[12],aiming to improve distributed data processing capabilities and resource optimization capabilities of the Smart Grid dispatching system.Article[13]provides the cloud platform logic components and programming models of the Smart Grid operation and dispatching system.The Distributed Fusion Genetic Algorithm(DFGA)to cloud computing is also introduced in[13].

In[14],the author elaborates on innovative research and development and practical application of cloud computing in the electric power SCADA system,and describes the deployment solutions,function implementation,key technologies,innovations,applications,and economic and social effects of cloud computing-based electric power dispatching and online analysis systems.Pioneering research and development and practical application of cloud computing in the electric power SCADA system are described.

In accordance with the research results of these articles,common private cloud computing platforms cannot meet the requirements for security,reliability,real time,and adaptability of control areas(Safety Zone I).As of now,traditional electric power SCADA application systems are seldom deployed on cloud computing platforms,and production control SCADA systems are seldom used in the entire real-time industrial production field.Therefore,we use private cloud solutions in this experimental study to verify the technical and commercial feasibility of cloud computing platforms in the electric power SCADA system.

3 Goals and Solutions of Experimental Study on Cloud Computing-Based Electric Power SCADA System

3.1 General Idea and Goals of the Experimental Study

Based on the above analysis,the use of cloud computing technologies for new-generation electric power SCADA application systems will be a new development direction for Smart Grid.However,existing traditional electric power SCADA systems still have a large market share in the electric power dispatching market.The aforementioned problems will persist,and the new-generation Smart Grid dispatching application sys-tem based on cloud computing is still at an early stage of exploration,research,and development,with a large room for largescale commercial deployment.It is very meaningful and valuable to use cloud computing technologies to solve the existing problems in the electric power SCADA system,and facilitate smooth transition and evolution of the existing electric power SCADA system before sophisticated application of the cloud computing dispatching and monitoring system.Therefore,ZTE together with Dongfang Electronics made attempts in this regard,built a research platform in the laboratory environment for experimental verification,and achieved the expected results.

The general idea of the experimental study is to complete operation tests of traditional electric power SCADA systems on cloud computing platforms,and integrate the main application modules of the electric power SCADA systems on the cloud computing platforms to verify their adaptability,reliability,security,and real time.

Major goals of this study include design and development of the solutions to integrating traditional electric power SCADA systems and cloud computing platforms,and test and validation of traditional electric power SCADA services on cloud computing platforms.This study assesses the adaptability,reliability,security,and real time of integrating cloud computing platforms and traditional electric power SCADA systems,thoroughly understands the differentiated requirements of electric power SCADA systems for cloud computing platforms,and proposes the development direction for electric power SCADA systems based on the cloud computing architecture.

3.2 Overall Solution to the Experimental Study

This experimental study uses the ZXTECS cloud computing platform developed by ZTE.The ZXTECS cloud computing platform based on computing,storage,and network virtualization provides resource management and scheduling functions. The ZXTECS platform based on the OpenStack cloud management platform integrates the network function virtualization(NFV)architecture,enhances the support for performance and high availability,and is an integrated ICT cloud management platform meeting both IT and CT cloud computing requirements.

Fig.2 shows the system architecture of the ZXTECS platform.Major features of this platform include 1)Openness: open and unified resource pool management;2)High performance:performance optimization of virtual computing to meet the requirements of NFV for high-performance virtualization;3)High reliability:live migration of virtual machines,watchdog,exception recovery,remote resetting,and control node cluster functions;4)High usability:automatic upgrade deployment,real-time alarms,and performance statistics.

▲Figure 2.System architecture of the ZXTECS cloud computing platform.

The electric power SCADA system uses the DF8000 series integrated software of Dongfang Electronics for power dispatching.This is a new-generation power SCADA system developed by using the latest computer communications technology,database technology,object-oriented technology,component technology,Internet technology,and dynamic server technology,and following the CORBA middle ware specifications,IEC61970 CIM/CIS,IEC61968,IEC61850,and international SOA standards.By using the SOA and loosely-coupled UI design,the DF8000 system achieves unified operations,monitoring,management,and maintenance of the entire system,following the trend for growing integration of dispatching information in the electric power system.The DF8000 system has been highly recognized in the international and domestic markets,and achieved an influential position in the industry.

The computing,storage,and network resources required for system tests are provided by the resource pools on the cloud computing platform,based on which the DF8000 system is integrated.

Fig.3 shows the logical networking structure of the DF8000 system.Virtualization deployment of the history server,SCADA servers(multiple sets can be deployed as required,and one set is deployed in this experiment),front-end acquisition servers,and PAS server is implemented on the cloud computing platform.The system uses a dual-Ethernet architecture.To meet the reliability requirements of the system,two servers should be deployed for each of the aforementioned server type except the PAS server and simulation server.Two virtual servers are deployed on different physical machines,implementing the reliability function of traditional hot-standby clusters.

▲Figure 3.Logical networking solution of the DF8000 SCADA application system.

A simulation server is deployed in the system as the simulation data generation server for the experimental test.According to the dispatching master system of a provincial capital(in which capacity of the power grid is more than 15 GW for 4.3 million users until 2015),the data size is 500,000 points.The simulation data generation server is connected to the front-end data acquisition server through the network provided by the cloud computing platform.

Restricted by the experimental resources,in order to ensure resource allocation to the servers,workstation scheduling resources are not provided on the cloud computing platform,and workstations are scheduled through ordinary PCs.

3.2.1 Physical Networking Solution

Fig.4 shows that the system is divided into the computing plane and control plane.Two mutual-backup management servers are deployed on the control plane,and manage computing nodes through dual high-speed Ethernets.The control plane and computing plane(or the business plane)are isolated to ensure security.The control plane implements management and monitoring functions of the cloud computing platform.The computing plane consists of the computing server,storage server,high-speed Ethernet,and dispatching workstations,which are the basic physical resources of the cloud computing platform.This solution involves three computing servers,dualplane high-speed Ethernet,a set of high-performance storage devices,and two dispatching workstations.

3.2.2 Integrated Logic Structure

Fig.5 shows the logical integration architecture of the cloud computing platform and SCADA system.The cloud computing platform provides basic IaaS services,including cloud security,resource pool,operations management,and virtual machine scheduling management functions.The functions in the dotted red box are not involved in this experiment.In accordance with the logical networking structure shown in Fig.3,the cloud computing platform provides the SCADA system with computing,storage,and network resources,as well as operating systems,databases,and other platform software through virtual machine scheduling management,and finally implements basic IaaS services of the cloud computing platform.The electric power SCADA software system deploys related application systems on the virtual machine in a conventional manner to achieve various functions of the electric power SCADA system.

Tables 1 and 2 show the test platform environment and configurations.

This experimental test platform is built and deployed in a test lab of the Central R&D Institute in the ZTE Nanjing R&D Center.The professional electric power SCADA testers of Dongfang Electronics log in to the Dispatcher's Workstation through Remote Desktop,and perform tests in accordance with the test outline.

4 Content and Conclusion of the Experimental Test

4.1 Content and Analysis of the Experimental Test

The experimental test involves function,performance,and saturation tests,which are performed in accordance with the standard test outline of the DF8000 application software.

▲Figure 4.Physical networking solution of the cloud computing platform in the experimental environment.

▲Figure 5.Integrated software architecture of the cloud computing platform and electric power SCADA system in the experimental environment.

The function tests mainly verify the design functions to be implemented by the DF8000 on the cloud computing platform,and the integrity of its functions.As required by the test out-line,the function tests involve four electric power dispatching functions(including SCADA,EMS,AVC,and AGC),with a total of 1343 function points and 59,389 I/O test points.

The performance tests are divided into two levels,with 66 level-1 test items and 206,104 I/O points,and 64 level-2 test items and 501,251 I/O points.The saturation tests are also divided into two levels,with 40 level-1 test items and 206,103 I/O points,and 64 level-2 test items and 501,251 I/ O points.

Function tests of the above 1330 items in the 1343 function items were conducted,with a pass rate of 100%.The other 13 function items related to printing,GPS time calibration,and pulse meters were not tested because related devices were not deployed on the experimental test platform. These items are not directly related to the computing platform,and do not affect the test goals.

The performance and saturation tests were conducted at two different load levels:level-1 system load with 206,103 I/O points,and level-2 system load with 501,251 I/O points.One item failed in the level-1 load performance tests,with a pass rate of 98.5%.Two items failed in the level-2 load performance test,with a pass rate of 96.9%.These items failed because the simulation PC memory load on the dispatcher node exceeded 30%.

The saturation tests were also conducted at two I/O load levels,with full-load operations for 72 hours.A total of 40 level-1 items and 64 level-2 items are involved,with the pass rates of97.5%and 96.9%,respectively.For the failed items,the memory usage on the dispatcher node exceeded 30%,and memory and CPU usage on the simulation server is high.Similar to performance tests,the dispatcher node is restricted by the experimental test platform.The simulation server is deployed only for the test,and is not needed in actual application deployment.Due to the limitations of test resources,the performance of the simulation server cannot be improved.

Table 3 is the detailed statistical results of experimental tests.Table 4 is an analysis of the results of the experiment.

▼Table 3.Experimental test results

▼Table 4.Test result analysis

·Suitability Evaluation

Through the whole tests,the SCADA system based on the ZXTECS Cloud computing platform are running very well,the test results have proved the professional private cloud platform are suitable to the power SCADA system deployment.

·Reliablity Evaluation

The reliablity test items such as Live Migration,Save/Restore,Fault Recover,Watch Dog,Fault Reset etc.are all passed successfully.All these tests are used to evalute the SCADA system reliable operation status,recover capabilties under the fault situations.The results have proved the SCADA system based on ZXTECS platform meet the power SCADA system reliability requirements.

·Security Evaluation

The cloud computing platform deployed for the electric power SCADA system is a professional private cloud platform,with the overall architecture deployed in the control zone(Safety Zone I),in line with the requirements of the Power Monitoring System Security Regulations.The system logic structure and security features of tested SCADA system are not changed.It provides the basic security.The professional private cloud provides comprehensive cloud securityprotection stucture.

·Real-time Evaluation

There are 12 items are related with the system real-time capabilities shown is Table 5.The test results indicate that realttime performance is meet the requirement of the SCADA system.The CPU load rate,memory storage rate tests result indicate the cloud computing platform has eough computing perfor-mance margin.Professional private platform provide elastic computing resources allocation in time for the power SCADA system to gurantee the real-time performance adequately.

▼Table 5.The real-time performance test results

4.2 Results

Compared with the test results of the traditional IT architecture,the function,performance,and Saturation test results indicate that the indicators of the SCADA/EMS system based on the cloud computing platform meet the actual needs of power grid operations,and some indicators,such as the network load rate,are better than those of the traditional IT architecture.It can be seen from the function,performance,and pressure test results that the deployment of electric power SCADA system software on the cloud computing platform is feasible,with the applicability and real time of the system meeting commercial requirements.In addition,reliability function tests such as live migration of virtual machines,fault recovery,watchdog,and fault resetting were also conducted successfully,with the system reliability meeting the requirements of the electric power SCADA system.According to this experiment,the electric power SCADA system based on the cloud computing platform has the following advantages:

·Through the cloud computing virtualization technology,system platform resources can be flexibly allocated according to the data traffic of the power grid.

·Parallel data acquisition systems are used to significantly reduce hardware thresholds,improve data acquisition capacity,simplify future system expansion,and effectively improve system resource utilization.

·Parallel real-time data processing systems and distributed data storage are used to greatly improve data processing capabilities.

·Application software,storage,and data resources are provided as services,and resource utilization costs are decreased substantially by taking full advantage of cloud computing.

·The cloud computing virtualization technology reduces the coupling between resource users and resource implementation,so that users are no longer dependent on specific resource implementation,and the system administrator can reduce the impact of IT resource maintenance and upgrade on users.

·Throughout the experimental test,only a system administrator is needed for maintenance,significantly reducing the time required for maintenance.

5 Prospects of Cloud Computing Technology Application in the Electric Power SCADA System

5.1 Benefits Brought by the Cloud Computing Platform Deployed in the Electric Power SCADA System

The overall performance of the electric power SCADA system based on the cloud computing platform is much higher than that of the traditional IT platform.It can be seen from application analysis calculation of telecom operators that the average resource utilization of IT systems on traditional platforms is lower than 30%,and that on cloud computing platforms exceeds 60%.It takes 2-4 hours for terminal operation and maintenance through traditional PCs,and only a few minutes for VM maintenance based on cloud computing platforms.The average service launch period has also been shortened from 1-3 months on traditional platforms to 1-3 weeks on cloud computing platforms.The energy consumption of VM private cloud terminals is reduced by over 70%than traditional PCs.The cloud computing platform has higher data security than traditional IT platforms because of centralized data management and control. The customer experience on cloud computing platforms has been optimized significantly.Users only need to focus on business implementation,and corresponding hardware,software installation,operation and maintenance,and operating systems are maintained on the platform in a unified way,avoiding repeated work of professional users.In a word,the electric power SCADA system based on the cloud computing platform will help electric power industry customers reduce overall costs and improve efficiency.

5.2 Feasibility of Cloud Computing Platform Deployment in the Electric Power SCADA System

Technical feasibility:This experiment shows that the cloud computing platform meets the adaptability,real time,and reliability requirements of the electric power SCADA system,is in line with technological development trends and market demands,and therefore is technically feasible.

Economic feasibility:The features of the cloud computing platform,such as efficient resource usage,reduced energy consumption,and efficient maintenance,are in line with the requirements of power grids for upgrade,business continuity,rapid deployment of new services,and overall cost reduction.

Security feasibility:The security of electric power SCADA system based on professional private cloud platform is guaranteed and has been strengthened with cloud security functions.

6 Conclusion

In this paper,we describe the goals,contents,and results of the experimental study on the cloud computing-based electric power SCADA systems,and indicates that the professional private cloud computing platform meets the technical,economic,and security requirements of the electric power SCADA system,and has commercial feasibility.The electric power SCADA system is a typical application in the real-time industrial production control field.The results of this experimental study shows that industrial SCADA software systems can be deployed on similar professional private cloud platforms.The professional private cloud solution facilitates the application ofcloud computing technologies in the professional real-time production control field,and brings economic and social benefits for industrial production.

[1]T.Fusheng,Power System Dispatching Automation and Energy Management System.Chengdu,China:Sichuan University Press,2004.

[2]Z.Mingguang,Electric Power System Telecontrol and Dispatching Automation. Beijing,China:China Electric Power Press,2010.

[3]Z.Yongjian,Electric Power System Monitoring and Dispatching Automation.Beijing,China:Electric Power Press,2004.

[4]X.Yaozhong,S.Junjie,and Z.Jingyang,“Technology development trends of Smart Grid dispatching and control systems,”Automation of Electric Power Systems,vol.39,no.1,pp.3-6,2015,doi:10.7500/AEPS20141008024.

[5]Z.Junhua,W.Fushuan,X.Yusheng,and L.Zhenzhi,“Cloud computing:Implementing an essential computing platform for future power systems,”Automation of Electric Power Systems,vol.34,no.15,pp.1-7,2010.

[6]W.Kaifeng,L.Wantao,and L.Yanhu,“Cloud computing-based power big data analysis technology and its application,”China Power,vol.48,no.2,111-113.

[7]E.Thomas,M.Zaigham,and P.Ricardo,Cloud Computing Concepts,Technology and Architecture.Beijing:China Machine Press.

[8]S.Zhihao,M.Feng,and J.Hongcheng,“Research on application of resource pool virtualization technology,”Electric Power Information and Communication Technology,vol.13,no.3,pp.39-43,2015.

[9]W.Zhimin and X.Bo,“Study on provincial power grid enterprise data center platform based on cloud computing,”Electric Power Information and Communication Technology,vol.13,no.3,pp.14-18,2015.

[10]C.Y.Yuesong,Z.Jia,and D.Haiting,“Information data center management supported by cloud platform,”Electric Power Information and Communication Technology,vol.12,no.7,pp.79-82,2014.

[11]C.Yang,G.Zhiyuan,and Y.Shengchun,“Application of cloud computing in power dispatching systems,”China Power,vol.45,no.6,pp.15-16,2012.

[12]H.Zhixin and L.Lian,Research on Smart Grid dispatching system based on cloud computing.Tianjin:Tianjin University of Technology,2014.

[13]Z.Yihui.“Research on the operation dispatching technology system of Smart Grid based on cloud computing,”China Electric Power Education,no.15,pp. 151-152,2011.

[14]L.Lixin,D.Fangchun,L.Qiang,and H.Jing,Retrieved from Outstanding ITBased Achievements of the Electric Power Industry.Beijing:China Electricity Council.

Manuscript received:2015-07-01

Biographies

Yongbo Chen(chen.yongbo212@zte.com.cn)received the bachelor degree in water conservancy and hydroelectric engineering from North China University of Water Resources and Electric Power.He is now the senior engineer of ZTE Smart Grid Industry Planning.His research interests include the integration of smart grid and MICT technology integration innovation R&D.

Jijun Chen(chen.jijun@zte.com.cn)received his master's degree in electrical engineering in control Theory and Application Department from Automatic Control,Northwestern Polytechnic University in 2002.He is now the chief engineer of ZTE Government&Enterprise business department.His research engaged in advanced information and communication technologies in the field of smart grid application research and planning.

Jiafeng Gan(ganjiafeng@dongfang-china.com)graduated from Hefei University of Technology in 1998,and received his master's degree from Tianjin University Computer Science in 2007.He is the senior engineer of Yantai Dongfang Electronics Co.,Ltd..His research mainly engaged in the research and development of electric power SCADA system.

Call for Papers ZTE CommunicationsSpecial Issue on Security and Privacy in Communications

Modern communication allows billions of objects in the physical world as well as virtual environments to exchange data with each other in an autonomous way so as to create smart environments. However,modern communication also introduces new challenges for the security of systems and processes and the privacy of individuals.There is an increasing demand for development of new security and privacy approaches to guarantee the security,privacy,integrity,and availability of resources in modern communication.

This feature topic will benefit the research and development community towards identifying challenges and disseminating the latest methodologies and solutions to security and privacy issues in modern communication technologies.Its objective is to publish highquality and practical articles presenting open issues,algorithms,protocols,policies,frameworks,standards,systems,and solutions for communication related to security and privacy.All received submissions will be sent out for peer review by at least two experts in the field and evaluated with respect to relevance to the special issue,level of innovation,depth of contributions,and quality of presentation.Reviews and case studies,which address state-of-art research and state-of-practice industry experiences,are also welcome.Guest editors will make an initial determination of the suitability and scope of all submissions.

Paper Submission

Please send your manuscripts in pdf format to the Guest Editors(wanlei.zhou@deakin.edu.au and CC to g.min@exeter.ac.uk).Your papers should be no more than 25 pages double-spaced or 10 pages single-spaced and double columns.

Timetable

Paper Submission Due:December 1,2015. Confirmation of acceptance:February 1,2016 Final Manuscript Due:March 1,2016

The publication is scheduled on June 2016.

Guest Editors

Professor Wanlei Zhou,School of Information Technology,Deakin University,Australia(wanlei.zhou@deakin.edu.au)

Professor Geyong Min,Department of Mathematics and Computer Science,University of Exeter,UK(g.min@exeter.ac.uk)