TunnelConstruction
ANNUALCONTENTS(Vol.34,2014)
ExpertForum
Views on Key Technical Issues of Construction of Taiwan Strait Tunnel
SUNJun(No.1-1)
Tunneling by TBM/shield in China: State-of-art,Problems and Proposals
WANGMengshu(No.3-179)
Development and Application of Construction Technologies for Underground Water-sealed Energy Storage Caverns
HONGKairong(No.3-188)
Challenges and Prospectives of Construction of Long-distance Inclined Shafts of Coal Mines by Shield/TBM
HEChuan(No.4-287)
Reform of Investment and Financing System of Infrastructures in Mainland China: Experience from TOD of Urban Rail Transit Works
ZHUXiaobing(No.5-397)
Challenges in Construction of Underwater Tunnels and Countermeasures
QIANQihu(No.6-503)
Prospects on New Technologies of Super-large Diameter Shield Machine for Qiongzhou Strait Tunnel
CHENKui(No.7-603)
Countermeasures for Deep and Thick Soft Foundation under Serious Back-silting Condition: Case Study on Artificial Island and Immersed Tunnel of Hong Kong-Zhuhai-Macao Bridge Project
SUNJun(No.9-807)
Environment Issues of Tunnels and Their Countermeasures
GUOShanyun(No.9-815)
Promoting TBM in Tunnel Construction in China
QIMengxue(No.11-1019)
Research
Experiment on Mechanical Property of Straight-wall Semicircle-arch Concrete-filled Steel Tube Support and its Application
GAOYanfa,WANGJun,HUANGWanpeng,CHENBinghui,WANGLiang,WANGChao(No.1-6)
Highway Tunnel Surrounding Rock Deformation Prediction Model Based on Support Vector Machine Optimized by Ant Colony Optimization and Its Application
QIUZhigang(No.1-13)
Georobot-based Automatic Deformation Monitoring in Tunnel Construction
FANBen,ZHENGJiqiang,ZHUKundian(No.1-19)
Study on Rapid-hardening High-performance Simultaneous Grouting Material for Shield-bored Tunnels
XUJianping,LINWenshu,XUKe,LINJianping,WANGBiao,MIAOQiang,DingQingjun(No.2-95)
Study on Ground Penetrating Shield-bored Tunnel Calculation Parameters in Modified Routine Method
ZHANGYinping(No.2-101)
Study on Water-tightness and Pumpability of Shield Tail Sealing Grease
WANGDeqian(No.2-107)
Mixing Proportion of and Key Construction Technologies for Extruded Concrete Lining of Utility Tunnels
LIWenjun(No.2-111)
Study on Influence of Excavation of Foundation Pit on Deformation of Underlying Tunnel in Complex Ground
ZHAOJun,GANPenglu,SHENWenming,LIUWei(No.2-118)
Analysis on Cost of Shield Boring across Hard Rocks
SHILiu,LIGuangtao(No.2-124)
Study on Instability of Excavation of Deep Tunnels Considering Disturbance Action of Vibration
LVXiangfeng(No.2-129)
Application of Wireless Sensor Network Technology in Tunnel Deformation Monitoring and Disaster Prevention
JIZhong(No.2-134)
Comparison and Contrast between TGP206 and TSP203 Advance Geology Prediction System: Advantages of TGP206
LIUYunzhen(No.3-198)
Development of Additives Dedicated for Preparing High-performance Simultaneous Grouting Material
ZHOUShaodong,LINWenshu,WANGHongxi,XUKe,LINJianping,WANGBiao,DINGQingjun(No.3-205)
Study on Control of Hot and Humid Environment in TBM Driving of Zhongtianshan Extra-long Tunnel
WANGJinzhong(No.3-212)
Case Study on Structural Safety of Large Cross-section Tailrace Tunnel of Huangjinping Hydropower Station
YIZerong,YANGChao,WANGYusuo(No.3-216)
Analysis on Influence on Lining of Existing Railway Tunnel Imposed by Blasting Construction of Water-releasing Tunnel
KONGJinghua(No.3-221)
Deformation of and Numerical Analysis on Foundation of Wangjingxi Station on Line 13 of Beijing Metro Caused by Shield Tunneling below
ZHANGWenzheng(No.3-226)
Influence of Deformation Joint Spacing on Internal Force of Tunnel under Active Fault Movement
LIXuefeng,DAIZhiping,GUXueying,CAOZihao(No.3-237)
Analysis on Application of AHP Method in Selection of Cut-and-Cover Method
ZHULi,TIANHaiguang,YUANYong(No.3-243)
Analysis on Cutting-off of Non-fire-fighting Power Supply of Metro Stations
GUOLi(No.4-298)
Analysis on Influence of Construction of Deep Foundation Pit on Adjacent Buildings: Case Study on GZH-5 Bid Section of Dongguan-Huizhou Inter-city Rail Transit Project
WANGKaichun(No.4-303)
Analysis on Influence of Excavation of Foundation Pit of Municipal Tunnel on Existing Underlying Shield-bored Metro Tunnel
GAOQiang,YUWenlong(No.4-311)
Study on Minimum Distance between Centers of Tracks of Main Lines of Urban Rail Transit Works When Single Crossover is Set into Curve
ZHANGWenzheng,ZHANGZhiya,YINHuatuo,SHILonglong(No.4-318)
Partial Factor Method for Structure Calculation of Highway Tunnels
GUOXiaohong,SHUHeng,TUOYongfei(No.5-402)
Comments on Equipment Selection for Ventilation during Long-distance Dead-end Tunneling
SUNZhenchuan,GOUHongsong(No.5-408)
Characteristics of and Suggestions for BT Mode in Metro Construction in China
ZHUOFacheng,PANWeidong,BAIYun(No.5-413)
Analysis on Influence of Size Effect on Excavation Stability of Caverns in Jointed Rock Mass
CHENWenyi,YANGChaoshuai(No.5-418)
Analysis on Complicated Deep Metro Foundation Pit Supported by Ring Plate Substructures: Case Study on Wangjiadun Center Station on Line 3 of Wuhan Metro
LIUZhaogang(No.5-423)
Behavior of Combined Support Structure Consisting of “Large-diameter High-pressure Jet Grouting Piles + Double-row Borehole Cast Piles”
HUANGJun,CHENFangwei,ZHAOGuang,XINGDongdong,XIAOJunhua(No.6-508)
Case Study on Engineering Geological Conditions and Problems in Construction of Headrace Tunnel of CCS Hydropower Station in Ecuador by TBM Method
YANGJihua,QISanhong,GUOWeixin,YANGFengwei,LOUGuochuan(No.6-513)
Deformation of Uplift Piles and Its Influence on Calculation of Metro Station Structures
ZHANGYueming(No.6-519)
Analysis on Construction Safety of Optimized Double Side Drift Method
GUOJie(No.6-525)
Research on Shield Boring Attitude Control Based on Fuzzy PID Algorithm
GONGGuofang,HONGKairong,ZHOUTianyu,HOUDianqing,WANGLintao(No.7-608)
Roadmap for Metro Owner’s Project Risk Management
HUHao(No.7-614)
Analysis on Strength Concept in Uzbekistan Concrete Codes
CHENHongguang(No.7-619)
Study on Classification Methods of Surrounding Rock of Underground Powerhouse of CCS Hydropower Station
YANGJihua,GUOWeixin,QISanhong,ZHANGDangli(No.7-623)
Structural Seismic Analysis on a3-storey Metro Station with Retaining Walls
LIUJun,SHENXiaowei(No.7-629)
Field Test and Analysis on Stress of Lining of Large-Diameter River-crossing Shield Tunnel
LIANGYu,SUWenhui,FANGLigang,YANGJunsheng(No.7-637)
Experimental Study on Shear Properties of Interface between Segment of Shield Tunnel and New Composite Structure after Exposure to High Temperature
YANGCheng,YANZhiguo,ZHUHehua(No.7-642)
Study on Application of Different Self-adapting Kalman Filtering Methods in Data Processing in Settlement Prediction of Metro Tunnels
FANLeigang,TIANLinya,CHENXifeng(No.7-649)
Study on Feasibility of China-Nepal-India Railway Crossing Himalayas
GUFangfang,SHIZhenming,ZHENGYanlong,BAIYun(No.7-653)
Study on Range of Pressure on Tunnel Face of Earth Pressure Balanced Shield and Its Influence on Ground Surface Settlement
GONGQiuming,MOUShanqing,JIANGHouting,LUDechun(No.8-707)
Analysis on and Optimization of Construction Scheme of Closely-spaced Metro Tunnels with Different Cross-section Dimensions
DINGGaigai,JIANGHai,KONGXiangxing(No.8-715)
Study on Boring Parameters of Composite EPB Shield in Sandy Cobble Strata and Study on Ground Deformation Rule
YANGXiaohua(No.8-721)
Comparative Simulation Analysis on Applicability of Different Karst Cave Treatment Methods in Tunneling
ZHANGJianguo(No.8-731)
Development and Application of New Automatic Traverse Survey Robot
LVHongquan(No.8-737)
Application of Multiple Linear Regression Method in Compilation of Norm of Water Pumping in Tunneling
ZHANGHenghui(No.8-745)
Engineering Geological Properties of Soft Surrounding Rocks of Mountain-crossing Tunnels and Construction Countermeasures
ZHANGJianru(No.8-749)
Analysis on Rigidity of Primary Support of Composite Lining and Its Influencing Factors
LIChunqing,LIANGQingguo,WUXuyang,SUNKai(No.8-754)
Study on Blasting Vibration Control of Shallow Tunnel Based on HHT Analysis
ZOUDechen,WANGHailiang,WANGChunhui,LIChuan(No.8-760)
Analysis on Causes for and Renovation of Floor Structure of a High-speed Railway Tunnel Located in slightly-dipping Interbedded Rock Mass
WANGLichuan,XIAOXiaowen,LINHui(No.9-823)
Static and Dynamic Calculation and Feasibility Analysis of Ningdong Railway Crossing above a Water-conveyance Tunnel
CHENQiang,LIUFeng,XIANGHuawei,WANGShuguo(No.9-837)
Study on Waterproofing Joints of Segments in GPST Method
NINGZuoli(No.9-844)
Excavation Scheme Comparison and Secondary Support Installation Timing of Highway Tunnel in Water-containing Poorly-cemented Powder-fine Sandstone
DONGLei,SONGHongyan(No.9-849)
Experimental Study on Preparation and Filter Membrane Formation of Slurry during Hyperbaric Operation in Tunneling by Slurry Shield
MINFanlu,JIANGTeng,WEIDaiwei,ZHANGYazhou(No.9-857)
Survey and Research on Estimation Method of Against-inrush Safe Thickness of Rock Strata in Karst Tunnels
LIJi,LUHao,XIAYuanpu(No.9-862)
Field Experimental Study on Characteristics of Surrounding Rock Pressure of Mined Tunnel under Aircraft Dynamic Load
CHAOKai,TANZhongsheng(No.9-873)
Analysis on Characteristics of and Causes for Defects of Coal Measure Section of Jiazhuqing Tunnel
LIUWei(No.10-921)
Study on Optimization of Parameters of Primary Support of Metro Tunnel
ZHANGTao(No.10-926)
Shield Boring of Metro Tunnel Perpendicularly Crossing Underneath Existing Tunnel: Analysis on Influence of Shield Boring on Existing Tunnel
KANGZuo,DAIGuanghui(No.10-931)
Comparative Study on Structural Types of GINA Gaskets Used in Immersed Tunnel
HUZhinan,YANGPeng,SHANChao,RENYuzheng,DANGDing(No.10-937)
Study on Long-term and Short-term Working Behavior of Composite Wall of Super-deep and Super-large Working Shaft
LIXiaochun(No.11-1024)
Study on Strata Deformation Characteristics of Dynamic Construction of Overlapping Shield Tunnels with Different Intersection Angles
ZHOUJianjun,YANGZhenxing,GUOLu(No.11-1031)
Application of Parameter-adjustment-based Selecting Weight Iteration Method in Cross-section Monitoring of Metro Works
HELei,CHENHao,SUIXiuzhen(No.11-1036)
Feasibility Study and Discussion on Tunnel Excavation by Water Jet Technology
WANGDong,LIYongsheng,GOUHongsong(No.11-1042)
Exploration of Zones Disturbed by Metro Construction and Estimation of Grouting Reinforcement Effect
CHENNing,LIUChao(No.11-1049)
Study on Control of Ground Surface Settlement: Case Study on Adjacent Tunnel Tubes of Shenzhen Metro
ZHAOJingjing,SUWenji(No.11-1055)
Study on and Execution of Large-scale Underground Reinforced Concrete Structure without Expansion Joints: Case Study on Futian Underground Comprehensive Transportation Hub
LIUKading(No.12-1113)
Analysis on and Monitoring of Influence of Blasting Vibration of Highway Tunnel on Adjacent Water Conveyance Tunnel
LIUTuo(No.12-1126)
Study on Acceleration Mechanism of Liquid Alkali-free Accelerating Components
HEXiongfei,ZHANGXun(No.12-1131)
Analysis on Influence of Construction of Mining Tunnel on Nanjing-Hexian Inter-city Railway Crossing Underneath Existing Freight Railway Tunnel
PENGHongxia,CHENGYunyan,WANGHuaidong(No.12-1137)
Case Study on Transverse Ground Surface Settlement of Land Section of Shiziyang Tunnel Bored by Shield
YANGYandong,CHENKui,LIFengyuan,ZHOUJianjun(No.12-1143)
Study on Cyclic Use of Waste Clay in Preparing Slurry for Slurry Shield Boring
JIANGTeng,YAOZhanhu,MINFanlu(No.12-1148)
Planning&Design
Analysis on Transfer Modes between Existing Double-track Metro Stations of Beijing Metro with Long-term Metro Stations
SHIGuangyin(No.1-24)
Case Study on Design of Highway Overcrossing Existing Railway Tunnel
ZHOUChao(No.1-32)
Numerical Analysis on Design of Protection Measures for Ancillary Structures of Wangchengpo Metro Station
WANGLin,TANPeilian,WANGGen(No.1-41)
Analysis on Transposition of Line 3 and Line 5 of Suzhou Urban Rail Transit in the Industrial Park
XIJun,SUNYuanguang(No.1-48)
Sustainable Development of Underground Space: Case Study on Optimized Design of Anti-floating of Underground Parking Garage of Yitian Village in Shenzhen,China
LIUKading(No.2-140)
Design of Qiansanmen Tunnel of Beijing Underground Rail Transit Line Crossing above Existing Metro Connection Gallery and Existing Power Tunnel
GUOJianyong(No.2-147)
Design of Support of Deep Foundation Pits in Hard-soft Heterogeneous Ground
ZHAOWenqiang(No.2-153)
Design of and Study on Embedded Channels of Segments of Shield-bored Tunnels of Line 9 of Shenzhen Metro
DUFeng(No.3-249)
Analysis on Influence of Arrangement Mode of Cooling Towers of Air-conditioning System of Metro Stations on Ground Surface Environment
LIANGYan,TANGChunhua(No.3-254)
Experience in Planning and Construction of Suzhou Rail Transit Works
LIANGChuangjia(No.3-259)
Case Study on Selection of Proper Retaining Structures for Different Types of Foundation Pits of Nanhulu Xiangjiang River Crossing Tunnel in Changsha,China
DUANJiandi(No.4-324)
Design and Construction of Underground Space Formed by Jacking Multiple Adjacent Rectangular Pipes
LIXiansen(No.4-331)
Application of Double Side Control Method in Fine-tuning Design of Line Slope of Metro Works
LIUYanchen(No.4-339)
Study on Underpinning of Puzhulu Metro Station on Line 3 of Nanjing Metro to Achieve Integral Launching of Large-diameter Shield Machine
LIUFangming(No.4-343)
Study on Passenger Transfer Modes of Underground Metro Stations
LIGepeng(No.5-428)
Case Study on Design Concept of Chegongmiao Comprehensive Station of Shenzhen Metro
ZENGLiang,LILu(No.5-443)
Case Study on Design of Dangjinshan Super-long Tunnel on Dunhuang-Golmud Railway
LUShiyang(No.5-452)
Architectural Design of Metro Stations in Downtown Area based on Site Environment
YAOXiangui(No.5-460)
Analysis on Influence of Plan Change on Alignment Design of Line 2 of Nanchang Metro
ZHANGZhiya,LIUKejing(No.5-467)
Case Study on Design of Commercial Space above Ancillary Routes of Guangzhou Metro
LUOLiang(No.6-534)
Study on Key Technologies for Geological Route Selection of Long Tunnels Crossing Spring Protection Zone and Goaf
ZHOULu(No.6-539)
Single Double-track Tunnel Tube or Twin Single-track Tunnel Tubes: Case Study on Super-long Yuntunbao Tunnel on Chengdu-Lanzhou Railway
ZHUYong,WUHua(No.7-661)
Analysis on Design Ideas for Business Development of Station Halls of Guangzhou Metro
LUOLiang(No.7-668)
Study on Use of Surrounded Space and Remaining Space of Cut-and-cover Metro Station
YAOXiangui(No.9-880)
Study on Optimization of Design of Mined Running Tunnel Crossing Underneath Large-scale Interchange in Urban Area
ZHANGJinwei(No.9-887)
Comprehensive Development and Utilization of Underground Space in Huaqiang North Commercial Area along Line 7 of Shenzhen Metro
CHENXiangsheng,ZHUYihai(No.10-944)
Case Study on Influence of Separation Wall on Deformation of Large Cross-section Shield-bored Tunnel on No.16 Line of Shanghai Metro
ZHANGZhongjie,YEGuanlin,TANGXiang(No.10-953)
Design Optimization and Construction of Steep Inclined Ventilation Shaft of E’gan Super-long Highway Tunnel
LIUSuo(No.10-959)
Key Technologies for Operation Ventilation Design of Road Tunnels Constructed by Shield Method
ZHANGDi(No.11-1062)
Countermeasures for Shield Cutting and Passing Underneath Piles of Existing Pedestrian Bridge
CHUKejun,ZHAOLiang,XUQian(No.11-1071)
Discussion on Design of Equipotential Bonding in Metro Stations
GAOTing,LIHongxing(No.11-1077)
Theory and Practice of Architectural Design of Entrance/Exit of Metro Station
YAOXiangui(No.12-1153)
Study on Engineering Geological Characteristics of Tertiary Strata of Zhongtiaoshan Tunnel on Menghua Railway
QINZhenggui,CHENYong(No.12-1163)
ConstructionTechnology
New Technologies Applied in Design and Construction of Shanghai Metro Works
BAITinghui(No.1-53)
Key Technologies Applied in Design and Construction of Artificial Islands and Immersed Tunnel of Hong Kong-Zhuhai-Macau Bridge (HZMB) Project
YINHaiqing(No.1-60)
Case Study on Ground Penetrating Shield Technology (GPST)
WUHuiming,ZHOUWenbo,TENGLi(No.1-67)
Key Points in Implementation of Bonded Circumferential Pre-stressing of Yellow River Crossing Tunnel on South-to-North Water Diversion Project
SUNZhenchuan,ZHONGShengxing(No.1-73)
Deformation Monitoring Technology for Deep Surrounding Rocks of Soil Tunnels Based on BOTDR
YINLong,WANGXiaolin(No.2-158)
Construction Survey of Tanba No.4 Spiral Tunnel on Xiaohe-Ankang Highway
NIUChunxia(No.2-163)
Analysis on and Control of Ground Surface Settlement:Case Study on Jiefangdalu Station of Line 1 of Changchun Metro Constructed by Top-down Construction Method under Protection of Cast-in-situ Arch
LIChunkui(No.3-264)
Design and Construction of Heat-keeping Water-proofing and Drainage System of Lafashan Tunnel in Extremely Cold Region
YUESheng,YANGChunbo,YANGYanling(No.3-269)
Tunneling by EPB Shield in Gravel Strata: Case Study on Line 4 of Chengdu Metro
FENGHuanhuan,YANGShujiang(No.3-274)
Hydropower Tunnel in High Geothermal Condition: Influences of High Ground Temperature and Countermeasures
SUHui,ZHANGHong,GENGXinchun,TANGYang,WANGJian(No.4-351)
Comments on Distance between Primary Support/Secondary Lining and Working Face of Inter-city Underground Railway Tunnels
NIEZhenyu(No.4-356)
Case Study on Installation of Shaped Steel Columns in High-strength Rocks in Construction of Chegongmiao Station of Line 11 of Shenzhen Metro
CHENYu,LIHailong(No.4-362)
Application of Automatic Monitoring Technology in Construction of Shield-bored Metro Tunnel Crossing Underneath High-speed Railway in Urban Area
LIMing(No.4-368)
Key Construction Technologies for Shield-bored Tunnel of Chegongmiao Station-Hongshuwan Station Section on No.11 Line of Shenzhen Metro Crossing Closely above Existing Metro Line
LIJianshe,CHENHuichao,LIZheng(No.4-374)
Model Test on Concrete Cutting Directly by Shield and Pile Foundation Cutting Technology
FUDeming(No.5-472)
Discussion on Blasting Excavation Sequence of Closely-spaced Stacked Tunnels in Medium-thick Layered Rocks: Case Study on Dalongshan-Huahuiyuan Running Tunnel on Line 6 of Chongqing Metro
CAIZhenyu,HUANGXu(No.5-478)
Tunneling through Water-rich Fractured Zone with Super-high Water Pressure: Case Study on Zhongtianshan Tunnel
WEIWenjie(No.5-484)
Analysis on Abnormal Data in TGP Advance Geological Prediction in Tunneling and Countermeasures
WEIJunke,ZHAOShaoqiang,CHENTao,LIUJianguo(No.5-489)
Anchoring Cable Removing Technology: Case Study on Hui-Min Shield-bored Tunnel on Line 1 of Zhengzhou Metro
LIGuangliang(No.5-494)
Case Study on Consolidation of Water-rich Cobble Ground in Nanning by means of Soletanche Grouting
WEIChenliang,WANGYuqing,TANGGaohong(No.5-499)
Technologies to Control Serious Deformation of Soft Rocks with High Ground Stress: Case Study on Liangshui Tunnel on Lanzhou-Chongqing Railway
ZHAOFushan(No.6-546)
Problems and Countermeasures in Tunneling by Open TBM in Chongqing Rail Transit Works
ZHANGZhiyong,GUANZhipeng,CHENXiaoping,LIUYongsheng(No.6-554)
Case Study on Blasting and Control Technologies for High Road Channel in Ningguo-Jixi Section on Yangzhou-Jixi Expressway Adjacent to Existing Railway Line
DONGLei,TANGDaoyi(No.6-558)
Case Study on Parallel Cut in Vibration-reducing Blasting of Hard Rock Tunnel in Urban Area
WANGJuntao,WANGHailiang,YANGQing(No.6-564)
Measures to Ensure Rapid Boring of Open TBM Based on “4M+1E” Factors
XUZan,XIEPeicai(No.6-569)
Research on and Application of Technologies for Cutting Tool Replacement under Hyperbaric Condition in Super-large Diameter Slurry Shield Boring
WUZhongshan,YANGZhao,YANGQing(No.7-673)
Technology for Deformation Control of Sujiachuan Large Cross-section Loess Tunnel on Baoji-Lanzhou Railway Constructed by Top Heading and Two-Bench Method
XIHao,LIXugan,SHIJian,HOUQi(No.7-679)
Technologies for Double-shell Support of Tunnels in Soft Rock with Extra-high Ground Stress
SIJianjun(No.7-685)
Measures to Improve Effect of Tunnel Lining Testing by means of Ground Penetrating Radar
ZHANGJiaming(No.7-691)
Treatment of Water Leakage and Freezing of an Operating Railway Tunnel on Ji’ning-Baotou Railway in Plateau and Extremely Cold Region
PANHonggui,WANGZhijie,LIBo,XUCaizhang,QIUYue,GAOFei(No.7-696)
Shield Tunneling Technologies for Xiamen Metro under Complex Geological Conditions
YANGShujiang(No.8-765)
Shield Docking Technologies for Shiziyang Tunnel
DUChuangdong(No.8-771)
Construction Technologies for Shield-bored Tunnel Crossing underneath Chuanshan Interchange
JIAGuangwu(No.8-778)
Automatic Water Pumping Technology for Inclined Shafts: Case Study on No.5 Inclined Shaft of Guanjiao Tunnel
NIUHongpei(No.8-784)
Shield Launching Technology for Running Tunnel on Small-radius Curve with One Single Shaft: Case Study on Line 2 of Dalian Metro
JIWeiguo(No.9-895)
Technology for Supporting Consisting of Systematic Bolts and Steel Arches Applied in Construction of Ingate and Junction Section between Ventilation Tunnel and Main Body of Metro Station
YANGHongshe(No.9-900)
Key Technologies for Rapid Construction of Baidian Tunnel in Tertiary Water-rich Sand Strata
GAOGuangyi(No.9-908)
Numerical Analysis on and Construction Technologies for Underpinning of Existing Underground Commercial Mall on Museum Station-Longjiang Street Station Section of Harbin Metro
DONGDaohai(No.10-967)
Study on Consolidation of Tunnel in Highly-permeable Sandy-gravel Strata by means of Ground Surface Soletanche Grouting
ZHANGMing(No.10-975)
Case Study on Treatment of Pile Foundations Encountered in Construction of Shield-bored Metro Tunnel
HEMaozhou(No.10-981)
Design and Application of On-line Monitoring System and Assessment on Safety of Ground Surface Buildings (Structures) in Metro Construction
LIZhihui,LIUWeijing,LIUWenfeng,GUOXingling,YANGPeng(No.10-990)
Analysis on Conditions for Rapid Boring of Single-shield TBM
YANGBin(No.10-997)
Study on Construction Scheme of Xinzhou Tunnel Crossing Underneath Datong-Yuncheng Highway
WANGHongchang,MAZhifu,ZENGQing,HUANGuangkun(No.11-1082)
Application of Hydraulic Blasting in Excavation of Laogeshan Tunnel
LIUJunjie(No.11-1087)
Countermeasures for Floating of Large-diameter Slurry Shield Tunnel in Soft Soil
WANGXin,LITingping,WANGYinchang(No.12-1168)
Technology for Concreting of Integrated Drainage Ditch and Cable Channel of High-speed Railway Tunnels in One Operation
YINZhonghui(No.12-1175)
Case Study on Consolidation of Water-rich Cobble/gravel Strata in Nanning by means of Soletanche Grouting
RENGuohong(No.12-1183)
Analysis on System Error of Horizontal Angle Survey of CPII Track Control Network of Long Tunnels and Countermeasures
DUZhigang(No.12-1191)
ConstructionMachinary
Analysis on and Countermeasures for Unbalanced Forces on Cutterhead of Large-diameter Shield
HANWeifeng,ZHOUJianjun,LIFengyuan(No.1-78)
Analysis and Control of Grease Consumption of Main Bearing of a Shield
LIDawei,ZHAOXinhe(No.1-83)
Case Study on Refurbishment of Cutterhead and Main Drive of Slurry Shield for Xiangjiang River Crossing Tunnel in Changsha,China
BUZhuangzhi,PUXiaobo,FENGPeipei(No.1-88)
Design and Application of Mountain-climbing Belt Conveyor System: Case Study on West Qinling Tunne
ZHANGXuejun(No.2-167)
Analysis on Causes for Failure of Main Drive Reducer of Shield Machine
CHANGKonglei,ZHAOXinhe,LIDawei(No.2-173)
Finite Element Analysis and Tests on Digging Device of an Open Shield Machine
YANGHaitao(No.3-280)
Development of HMI Configuration of Monitoring System of Shield Machine
TANShunhui,MENGXiangbo,XUShoutian,PUXiaobo(No.4-380)
Prediction of Bearing Comprehensive Rock-machine Experiment Platform based on Phase Space Reconstruction and Least Squares Support Vector Machine
LIHongbo,ZHOUJianjun,WANGZhufeng,ZHANGHepei,RENYingying(No.4-387)
Technical Reform of Electrical System of Rock Drilling Jumbo
SHENGuili,WUChaolai,LIANGYongfei(No.4-392)
Design and Application of a New Rear Propulsion System for Large Cross-Section Rectangular Tunnel Boring Machine
SHENPeijian(No.6-576)
Design and Type Selection of Shields Adaptable to Heterogeneous Ground in Shenzhen,China
TANShunhui(No.6-582)
An Optimized Design of Layout of Thrust Cylinders Fitting for Two Types of Segment Ring Divisions
XIAOJunxiang,YUANWenzheng(No.6-588)
Design of and Study on Advance Timbering ofφ6.22 m Open Shield
CUILishan,WANGJianhui,YANGHaitao(No.6-592)
Design of Electrical Control System of Diesel Locomotive Based on TTC60 Controller
WANGShuangwang,SUNZhihong(No.6-598)
Reform of Hydraulic Oil Tank of Rock-drilling Jumbo and Analysis on Its Heat Balance
WUXiangbin(No.7-703)
Study on Localization of Main Drive Reducers of Shield
LIUJinxiang,CHENKui,SUNShangzhen,FENGHuanhuan(No.8-790)
Reconnection Control System of Frequency-conversion Traction Locomotives Based on PLC
WANGQian,MENGYanlong,SUNZhihong(No.8-797)
Application of Vehicle-mounted Mobile Substation in Construction of Jilin-Tumen-Hunchun Passenger-dedicated Railway
GAOHong(No.8-802)
Comparison of Control Modes of Hydraulic Thrust System of Shields
JIALianhui(No.9-913)
Conceptual Design on a Non-cutterhead EPB Shield
LIJianbin,WANGKai(No.10-1001)
Case Study on Type Selection of Shields for Chengdu Metro
CAOZhi,LIJianxiang(No.10-1005)
Failure Types of Main Bearing of TBM and Analysis on Faults of Main Bearing of TBM Applied in Construction of West Qinling Tunnel
WANGYanbo(No.10-1011)
Analysis on Causes for Damages of Main Bearing of TB880E TBM
ZHANGHongyao(No.11-1092)
Key Technologies for Design of Super-large Rectangular Pipe Jacking Machine
JIALianhui(No.11-1098)
Development of Real-time Monitoring Data Reporting System of Shield Machine
MAQiang,PUXiaobo(No.11-1107)
Study on Synchronous Control Technologies for Cutter Head Driving Motors of Shield
RENYingying,ZHOUJianjun,WANGZhufeng,ZHANGHepei,LIHongbo(No.12-1196)
Design and Application of Cutterhead of Shield Boring in Water-rich Sandy Gravel Strata in Chengdu
ZHANGJianian,HUYujuan(No.12-1202)
Optimization of Arrangement of Thrust Cylinders of Dual-mode Shield for Inclined Tunnel
TAOWei,GUANHuisheng,GUOLichang,HUANGSonghe(No.12-1207)